warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Solar panels for warehouses in Devizes

Most of the industrial stock around Devizes carries a large, shallow-pitched roof that was never asked to do anything. Each survey records the cladding profile, the usable area once rooflights and plant are removed, and the export limit worth applying for.

906 kWh per kWp a year at this latitude, so a 500 kWp array models at about 453,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Devizes
96 m phase 1
Drawing Devizes unit
Roof 96 x 62 m
Array 500 kWp
Yield 453,000 kWh/yr
Scale 1:500 / Rev A / SN10

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Devizes / Wiltshire
South West industrial estate on the edge of a market town, with rooftop solar
Industrial stock of the kind we survey across South West.

Distribution centre solar across Wiltshire

What a roof in Devizes actually generates

Modelled irradiation at this latitude is 1161 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 906 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.

We survey across the SN postcode area, starting from SN10.

Wiltshire is the planning authority for most sites here, and the built-up area holds a population of about 19,490, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Devizes roof makes, month by month

What a Devizes roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 25 kWh per kWpJanFeb: 39 kWh per kWpFebMar: 74 kWh per kWpMarApr: 106 kWh per kWpAprMay: 123 kWh per kWpMayJun: 124 kWh per kWpJunJul: 125 kWh per kWpJul125 kWh Aug: 105 kWh per kWpAugSep: 83 kWh per kWpSepOct: 51 kWh per kWpOctNov: 30 kWh per kWpNovDec: 21 kWh per kWpDec

Jul produces 6.0 times what Dec does on the same roof. A 500 kWp array here models at about 453,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2512,500
Feb3919,500
Mar7437,000
Apr10653,000
May12361,500
Jun12462,000
Jul12562,500
Aug10552,500
Sep8341,500
Oct5125,500
Nov3015,000
Dec2110,500
Source: EU PVGIS v5.2
FIG. 2 Devizes against the rest of Wiltshire
  • Salisbury923
  • Melksham912
  • Warminster912
  • Trowbridge909
  • Devizes906
  • Marlborough900
  • Swindon899
  • Chippenham894

Devizes ranks 5 of 8 towns we cover in Wiltshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 894 to 923, a spread of 29 kWh per kWp. Within Wiltshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near SN10

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Hopton Road Industrial Estate Hopton PV Ltd 1.3 MW Ground Operational
Lower End Farm Good Energy Generation 4.9 MW Ground Operational
Lodge Farm (Poulshot) Hive Energy 14.5 MW Ground Operational
HM Erlestoke Solar Array Ministry of Justice 0.21 MW Ground Application Submitted
Blounts Court Farm, Potterne - Solar Panels Greenfield Energy Developments Limited 15 MW Ground Application Refused
Potterne Park Farm, Potterne - Solar Farm Potterne Solar Project Limited 49.9 MW Ground Application Refused

Grid connection through Scottish and Southern Electricity Networks

Connections around Devizes are handled by Scottish and Southern Electricity Networks, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a warehouse uses most of what the roof makes during the working day.

Across Wiltshire the planning database records 159 solar schemes totalling 1585 MW, of which 56 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Devizes

Is there enough sun in Devizes to make this work?
Modelled at 906 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 453,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once walkways and setbacks are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Who do we apply to for export in Devizes?
Capacity varies street by street, and only Scottish and Southern Electricity Networks can answer it for your connection. We ask the question early, because an export-limited offer changes the design rather than killing the scheme.
Do we need planning permission in Wiltshire?
In most cases no, because roof-mounted panels on commercial buildings sit within permitted development. The exceptions are listed buildings, conservation areas and arrays that stand proud of the roof plane. We check with Wiltshire first either way.
Has anyone near SN10 already done this?
The planning database records 6 solar schemes in this postcode district. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Wiltshire locations