warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Solar panels for warehouses in Chippenham

A Chippenham warehouse roof sits idle through exactly the hours its occupier buys the most expensive electricity. What decides a scheme here is the state of the covering and the load path, which is why the survey starts on the roof rather than in a spreadsheet.

894 kWh per kWp a year at this latitude, so a 500 kWp array models at about 447,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Chippenham
96 m phase 1
Drawing Chippenham unit
Roof 96 x 62 m
Array 500 kWp
Yield 447,000 kWh/yr
Scale 1:500 / Rev A / SN15

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Chippenham / Wiltshire
South West industrial estate on the edge of a market town, with rooftop solar
Industrial stock of the kind we survey across South West.

Logistics solar PV across Wiltshire

What a roof in Chippenham actually generates

Modelled irradiation at this latitude is 1144 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 894 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.

Distribution stock around Chippenham clusters on M4 J17, A350 and A4, which is where the large single-let roofs are.

Surveys run across SN postcodes, SN15 outward.

Wiltshire is the planning authority for most sites here, and the built-up area holds a population of about 36,090, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Chippenham roof makes, month by month

What a Chippenham roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 25 kWh per kWpJanFeb: 38 kWh per kWpFebMar: 73 kWh per kWpMarApr: 104 kWh per kWpAprMay: 121 kWh per kWpMayJun: 122 kWh per kWpJunJul: 124 kWh per kWpJul124 kWh Aug: 104 kWh per kWpAugSep: 81 kWh per kWpSepOct: 50 kWh per kWpOctNov: 30 kWh per kWpNovDec: 21 kWh per kWpDec

Jul produces 5.9 times what Dec does on the same roof. A 500 kWp array here models at about 447,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2512,500
Feb3819,000
Mar7336,500
Apr10452,000
May12160,500
Jun12261,000
Jul12462,000
Aug10452,000
Sep8140,500
Oct5025,000
Nov3015,000
Dec2110,500
Source: EU PVGIS v5.2
FIG. 2 Chippenham against the rest of Wiltshire
  • Salisbury923
  • Melksham912
  • Warminster912
  • Trowbridge909
  • Devizes906
  • Marlborough900
  • Swindon899
  • Chippenham894

Chippenham ranks 8 of 8 towns we cover in Wiltshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 894 to 923, a spread of 29 kWh per kWp. Within Wiltshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through Scottish and Southern Electricity Networks

Connections around Chippenham are handled by Scottish and Southern Electricity Networks, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a warehouse uses most of what the roof makes during the working day.

Across Wiltshire the planning database records 159 solar schemes totalling 1585 MW, of which 56 are operational (REPD Q1 2026).

Solar already consented near SN15

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Lake Farm AEE Renewables 5 MW Ground Operational
Bradenstoke solar park Defence Infrastructure Organisation / BSR 69.8 MW Ground Operational
Wick Farm Melksham Substation JBM Solar Projects 49.9 MW Ground Under Construction
Forest Gate - Solar Farm & Battery Storage Eden Renewables 49.9 MW Ground Awaiting Construction
Parsonage Way - Solar Panels Wavin Plastic Limited 1.6 MW Roof Awaiting Construction
Wiltshire College, Lackham - Solar Panels Wessex Energy Solutions 0.32 MW Roof Awaiting Construction
Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Chippenham

Is there enough sun in Chippenham to make this work?
Modelled at 894 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 447,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once walkways and setbacks are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Who do we apply to for export in Chippenham?
Capacity varies street by street, and only Scottish and Southern Electricity Networks can answer it for your connection. We ask the question early, because an export-limited offer changes the design rather than killing the scheme.
Do we need planning permission in Wiltshire?
In most cases no, because roof-mounted panels on commercial buildings sit within permitted development. The exceptions are listed buildings, conservation areas and arrays that stand proud of the roof plane. We check with Wiltshire first either way.
Has anyone near SN15 already done this?
The planning database records 6 solar schemes in this postcode district, 2 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Wiltshire locations