warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Solar panels for warehouses in Birmingham

What makes a Birmingham scheme work is rarely the panels. It is the condition of the roof underneath them. Each survey records the cladding profile, the usable area once rooflights and plant are removed, and the export limit worth applying for.

854 kWh per kWp a year at this latitude, so a 500 kWp array models at about 427,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Birmingham
96 m phase 1
Drawing Birmingham unit
Roof 96 x 62 m
Array 500 kWp
Yield 427,000 kWh/yr
Scale 1:500 / Rev A / B8

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Birmingham / West Midlands
Midlands logistics park beside a motorway junction, several roofs carrying arrays
Industrial stock of the kind we survey across West Midlands.

Logistics solar PV across West Midlands

What a roof in Birmingham actually generates

Modelled irradiation at this latitude is 1093 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 854 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 4 percent below the mean across the towns we cover, so the case here leans harder on how much you use on site rather than on raw generation.

Distribution stock around Birmingham clusters on M6 J6, M5 J1 and M42 J6, which is where the large single-let roofs are.

Surveys run across B postcodes, B8 outward.

Birmingham is the planning authority for most sites here, and the built-up area holds a population of about 1,121,375, which is large enough to pull in the regional distribution centres that come with the biggest roofs (ONS Census 2021 built-up areas).

FIG. 1 What a Birmingham roof makes, month by month

What a Birmingham roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

0255075100Jan: 23 kWh per kWpJanFeb: 37 kWh per kWpFebMar: 70 kWh per kWpMarApr: 98 kWh per kWpAprMay: 115 kWh per kWpMayJun: 117 kWh per kWpJunJul: 119 kWh per kWpJul119 kWh Aug: 101 kWh per kWpAugSep: 78 kWh per kWpSepOct: 48 kWh per kWpOctNov: 28 kWh per kWpNovDec: 20 kWh per kWpDec

Jul produces 6.0 times what Dec does on the same roof. A 500 kWp array here models at about 427,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2311,500
Feb3718,500
Mar7035,000
Apr9849,000
May11557,500
Jun11758,500
Jul11959,500
Aug10150,500
Sep7839,000
Oct4824,000
Nov2814,000
Dec2010,000
Source: EU PVGIS v5.2
FIG. 2 Birmingham against the rest of West Midlands
  • Coventry868
  • Solihull860
  • Birmingham854
  • West Bromwich852
  • Sutton Coldfield852
  • Walsall851
  • Dudley845
  • Wolverhampton839

Birmingham ranks 3 of 8 towns we cover in West Midlands on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 839 to 868, a spread of 29 kWh per kWp. Within West Midlands that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near B8

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Eden Boys Leadership Academy, Alum Rock Road - Solar Panels Star Academies n/a Roof Awaiting Construction
Network Park Industrial Estate, Duddeston Mill Road - Solar Panels Indurent Management Limited 0.21 MW Roof Application Submitted

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution operates the distribution network across West Midlands, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across West Midlands the planning database records 195 solar schemes totalling 533 MW, of which 3 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Birmingham

How much does a warehouse roof in Birmingham generate?
The model gives 854 kWh for every kWp installed here, so 500 kWp comes out at about 427,000 kWh a year before any shading losses. You need roughly 1,485 sqm of clear roof to fit it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Does the grid around Birmingham have capacity?
National Grid Electricity Distribution is the distribution network operator for West Midlands. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. We submit it as part of the design.
Is planning permission needed for panels on a Birmingham unit?
Usually permitted development covers it. We still put the question to Birmingham before design sign-off, and we tell you early if a full application is needed rather than discovering it late.
Has anyone near B8 already done this?
The planning database records 2 solar schemes in this postcode district, 2 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All West Midlands locations