warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Solar panels for warehouses in Washington

The economics of a Washington rooftop array turn on how much of the generation the occupier uses on site. The survey measures the roof, not the postcode: cladding profile, purlin centres, remaining sheet life and the load the frame can take.

828 kWh per kWp a year at this latitude, so a 500 kWp array models at about 414,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Washington
96 m phase 1
Drawing Washington unit
Roof 96 x 62 m
Array 500 kWp
Yield 414,000 kWh/yr
Scale 1:500 / Rev A / NE38

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Washington / Tyne and Wear
North East industrial estate with solar arrays on several unit roofs
Industrial stock of the kind we survey across North East.

Warehouse rooftop solar across Tyne and Wear

What a roof in Washington actually generates

Modelled irradiation at this latitude is 1055 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 828 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 7 percent below the mean across the towns we cover, so the case here leans harder on how much you use on site rather than on raw generation.

Distribution stock around Washington clusters on A1(M), A19 and A1231, which is where the large single-let roofs are.

Most of the units we look at here sit in the NE postcode area.

County Durham is the planning authority for most sites here, and the built-up area holds a population of about 51,320, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Washington roof makes, month by month

What a Washington roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

0255075100Jan: 19 kWh per kWpJanFeb: 35 kWh per kWpFebMar: 67 kWh per kWpMarApr: 98 kWh per kWpAprMay: 120 kWh per kWpMay120 kWh Jun: 113 kWh per kWpJunJul: 117 kWh per kWpJulAug: 99 kWh per kWpAugSep: 75 kWh per kWpSepOct: 44 kWh per kWpOctNov: 25 kWh per kWpNovDec: 15 kWh per kWpDec

May produces 8.0 times what Dec does on the same roof. A 500 kWp array here models at about 414,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan199,500
Feb3517,500
Mar6733,500
Apr9849,000
May12060,000
Jun11356,500
Jul11758,500
Aug9949,500
Sep7537,500
Oct4422,000
Nov2512,500
Dec157,500
Source: EU PVGIS v5.2
FIG. 2 Washington against the rest of Tyne and Wear
  • Sunderland849
  • South Shields849
  • North Shields833
  • Washington828
  • Gateshead822
  • Newcastle806

Washington ranks 4 of 6 towns we cover in Tyne and Wear on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 806 to 849, a spread of 43 kWh per kWp. On a 500 kWp array that is about 21,500 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near NE38

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Sedling Road - Solar Panels Roundel Manufacturing Limited 0.36 MW Roof Awaiting Construction
Griffiths Textiles Machines, Alston Road - Solar Panels Abrdn 0.7 MW Roof Awaiting Construction
Rocket Medical, Sedling Road - Solar PV System Rocket Medical Plc 0.43 MW Roof Awaiting Construction
Rolls Royce Plc, Radial Park Road - Solar Panels Rolls Royce 1.57 MW Roof Awaiting Construction
The Cylinder Service Centre, Sedling Road - Solar Panels Cylinder Service Centre 0.2 MW Roof Awaiting Construction
Washington Primary Care Centre, Parkway - Solar Panels City Hospital Sunderland NHS Foundation Trust 0.2 MW Roof Awaiting Construction

Grid connection through Northern Powergrid

Connections around Washington are handled by Northern Powergrid, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a warehouse uses most of what the roof makes during the working day.

Across Tyne and Wear the planning database records 116 solar schemes totalling 290 MW, of which 3 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Washington

Is there enough sun in Washington to make this work?
Modelled at 828 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 414,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once walkways and setbacks are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Who do we apply to for export in Washington?
Capacity varies street by street, and only Northern Powergrid can answer it for your connection. We ask the question early, because an export-limited offer changes the design rather than killing the scheme.
Do we need planning permission in County Durham?
In most cases no, because roof-mounted panels on commercial buildings sit within permitted development. The exceptions are listed buildings, conservation areas and arrays that stand proud of the roof plane. We check with County Durham first either way.
Has anyone near NE38 already done this?
The planning database records 6 solar schemes in this postcode district, 6 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Tyne and Wear locations