Solar panels for warehouses in Gateshead

What makes a Gateshead scheme work is rarely the panels. It is the condition of the roof underneath them. Each survey records the cladding profile, the usable area once rooflights and plant are removed, and the export limit worth applying for.

822 kWh per kWp a year at this latitude, so a 500 kWp array models at about 411,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Gateshead
96 m phase 1
Drawing Gateshead unit
Roof 96 x 62 m
Array 500 kWp
Yield 411,000 kWh/yr
Scale 1:500 / Rev A / NE10

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Gateshead / Tyne and Wear
North East industrial estate with solar arrays on several unit roofs
Industrial stock of the kind we survey across North East.

Logistics solar PV across Tyne and Wear

What a roof in Gateshead actually generates

Modelled irradiation at this latitude is 1047 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 822 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 7 percent below the mean across the towns we cover, so the case here leans harder on how much you use on site rather than on raw generation.

Distribution stock around Gateshead clusters on A1(M), A1 and A184, which is where the large single-let roofs are.

Surveys run across NE postcodes, NE10 outward.

Gateshead is the planning authority for most sites here, and the built-up area holds a population of about 115,280, the size that tends to be served by mid-box last-mile units rather than national hubs (ONS Census 2021 built-up areas).

FIG. 1 What a Gateshead roof makes, month by month

What a Gateshead roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

0255075100Jan: 19 kWh per kWpJanFeb: 35 kWh per kWpFebMar: 67 kWh per kWpMarApr: 97 kWh per kWpAprMay: 119 kWh per kWpMay119 kWh Jun: 112 kWh per kWpJunJul: 116 kWh per kWpJulAug: 98 kWh per kWpAugSep: 75 kWh per kWpSepOct: 44 kWh per kWpOctNov: 25 kWh per kWpNovDec: 16 kWh per kWpDec

May produces 7.4 times what Dec does on the same roof. A 500 kWp array here models at about 411,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan199,500
Feb3517,500
Mar6733,500
Apr9748,500
May11959,500
Jun11256,000
Jul11658,000
Aug9849,000
Sep7537,500
Oct4422,000
Nov2512,500
Dec168,000
Source: EU PVGIS v5.2
FIG. 2 Gateshead against the rest of Tyne and Wear
  • Sunderland849
  • South Shields849
  • North Shields833
  • Washington828
  • Gateshead822
  • Newcastle806

Gateshead ranks 5 of 6 towns we cover in Tyne and Wear on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 806 to 849, a spread of 43 kWh per kWp. On a 500 kWp array that is about 21,500 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near NE10

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Neilson Road - Solar Photovoltaic Array Solar Advanced Systems trading 0.94 MW Ground Awaiting Construction
Robert Duncan Timber Limited, Green Lane - Solar Panels MH Southern & Co 0.21 MW Roof Awaiting Construction
NCL1, Follingsby Lane - Solar Panels Zestec Asset Management 3.9 MW Roof Awaiting Construction
Donwood Double Glazing, Stonehills Buildings - Unit A23 - Solar Panels Donwood Double Glazing Limited 0.19 MW Roof Awaiting Construction
Big Yellow Self Storage - Solar Panels Big Yellow Self Storage 0.18 MW Roof Awaiting Construction

Grid connection through Northern Powergrid

Northern Powergrid is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Tyne and Wear the planning database records 116 solar schemes totalling 290 MW, of which 3 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Gateshead

What would a 500 kWp array produce in Gateshead?
Yes, and the number matters more than the sunshine. At 822 kWh per kWp a year, a 500 kWp array on a Gateshead roof models at around 411,000 kWh. What changes the answer is how much of that you use on site rather than export. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection in Gateshead?
Applications go to Northern Powergrid, who run the network across Tyne and Wear. They decide the export limit, and we handle the G99 paperwork alongside the array design.
What does Gateshead require for rooftop solar?
Roof-mounted panels on a commercial building usually fall under permitted development, subject to the limits on projection above the roof plane and to the building not being listed or in a conservation area. We confirm the position with Gateshead before the design is finalised.
Has anyone near NE10 already done this?
The planning database records 5 solar schemes in this postcode district, 4 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.