Solar panels for warehouses in Lewes
Most of the industrial stock around Lewes carries a large, shallow-pitched roof that was never asked to do anything. The survey measures the roof, not the postcode: cladding profile, purlin centres, remaining sheet life and the load the frame can take.
1028 kWh per kWp a year at this latitude, so a 500 kWp array models at about 514,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in LewesIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Distribution centre solar across Sussex
What a roof in Lewes actually generates
Modelled irradiation at this latitude is 1301 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 1028 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 16 percent above the mean across the towns we cover, which is as good as UK rooftop gets outside the south coast.
We survey across the BN postcode area, starting from BN7.
Lewes is the planning authority for most sites here, and the built-up area holds a population of about 16,060, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).
Lewes ranks 2 of 10 towns we cover in Sussex on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 915 to 1028, a spread of 113 kWh per kWp. On a 500 kWp array that is about 56,500 kWh a year between the strongest and weakest town in the county.
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Lewes
- How much does a warehouse roof in Lewes generate?
- The model gives 1028 kWh for every kWp installed here, so 500 kWp comes out at about 514,000 kWh a year before any shading losses. You need roughly 1,485 sqm of clear roof to fit it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Is planning permission needed for panels on a Lewes unit?
- Usually permitted development covers it. We still put the question to Lewes before design sign-off, and we tell you early if a full application is needed rather than discovering it late.