Solar panels for warehouses in Crawley
Roof space is the one asset a Crawley unit already owns and rarely uses. We start with the covering and the structure, because a roof with five years left in it changes the answer entirely.
915 kWh per kWp a year at this latitude, so a 500 kWp array models at about 458,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in CrawleyIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Warehouse rooftop solar across Sussex
What a roof in Crawley actually generates
Modelled irradiation at this latitude is 1175 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 915 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 3 percent above the mean across the towns we cover, which is as good as UK rooftop gets outside the south coast.
Distribution stock around Crawley clusters on M23 J10, M23 J11 and A23, which is where the large single-let roofs are.
Most of the units we look at here sit in the RH postcode area.
Crawley is the planning authority for most sites here, and the built-up area holds a population of about 120,550, the size that tends to be served by mid-box last-mile units rather than national hubs (ONS Census 2021 built-up areas).
Crawley ranks 10 of 10 towns we cover in Sussex on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 915 to 1028, a spread of 113 kWh per kWp. On a 500 kWp array that is about 56,500 kWh a year between the strongest and weakest town in the county.
Solar already consented near RH10
From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.
| Scheme | Operator | Capacity | Mounting | Status |
|---|---|---|---|---|
| Majors Hill/Turners Hill Solar Farm | Haymaker Energy | 1.1 MW | Ground | Operational |
| Oriel High School | West Sussex County Council | 0.19 MW | Roof | Operational |
| Manor Royal, Rowfant - Solar PV Array | Vodafone Limited | 0.27 MW | Roof | Application Withdrawn |
| Unit 2, Hollywood Bowl, Crawley Leisure Park - Solar Array | Hollywood Bowl Group | 0.22 MW | Roof | Awaiting Construction |
| Welland Medical, Hydehurst Lane - Solar Panels | Welland Medical Limited | 0.94 MW | Roof | Awaiting Construction |
| Vodafone UK, Newton Road - Solar Panels | Custom Solar Limited | 0.27 MW | Roof | Awaiting Construction |
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Crawley
- Is there enough sun in Crawley to make this work?
- Modelled at 915 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 458,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once walkways and setbacks are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Do we need planning permission in Crawley?
- In most cases no, because roof-mounted panels on commercial buildings sit within permitted development. The exceptions are listed buildings, conservation areas and arrays that stand proud of the roof plane. We check with Crawley first either way.
- Has anyone near RH10 already done this?
- The planning database records 6 solar schemes in this postcode district, 5 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.