Solar panels for warehouses in Chichester
The economics of a Chichester rooftop array turn on how much of the generation the occupier uses on site. The survey measures the roof, not the postcode: cladding profile, purlin centres, remaining sheet life and the load the frame can take.
1028 kWh per kWp a year at this latitude, so a 500 kWp array models at about 514,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in ChichesterIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Warehouse rooftop solar across Sussex
What a roof in Chichester actually generates
Modelled irradiation at this latitude is 1303 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 1028 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 16 percent above the mean across the towns we cover, which is as good as UK rooftop gets outside the south coast.
Distribution stock around Chichester clusters on A27 and A286, which is where the large single-let roofs are.
Most of the units we look at here sit in the PO postcode area.
Chichester is the planning authority for most sites here, and the built-up area holds a population of about 31,710, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).
Chichester ranks 1 of 10 towns we cover in Sussex on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 915 to 1028, a spread of 113 kWh per kWp. On a 500 kWp array that is about 56,500 kWh a year between the strongest and weakest town in the county.
Solar already consented near PO19
From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.
| Scheme | Operator | Capacity | Mounting | Status |
|---|---|---|---|---|
| Hunters Race Solar Park | Aardvark Environment Matters | 9.3 MW | Ground | Operational |
| Former Westhampnett Landfill | West Sussex County Council | 7.5 MW | Ground | Operational |
| Via Ravenna - Solar Panel | Chichester District Council | 0.17 MW | Roof | Awaiting Construction |
| Teknoflex, Quarry Lane - Solar Panels | Contract Candles | 0.18 MW | Roof | Awaiting Construction |
| Chichester College, Westgate Fields - Solar Panels | Green Nation Solar Energy | 0.35 MW | Roof | Awaiting Construction |
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Chichester
- Is there enough sun in Chichester to make this work?
- Modelled at 1028 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 514,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once walkways and setbacks are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Do we need planning permission in Chichester?
- In most cases no, because roof-mounted panels on commercial buildings sit within permitted development. The exceptions are listed buildings, conservation areas and arrays that stand proud of the roof plane. We check with Chichester first either way.
- Has anyone near PO19 already done this?
- The planning database records 5 solar schemes in this postcode district, 3 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.