Solar panels for warehouses in Nottingham

A Nottingham warehouse roof sits idle through exactly the hours its occupier buys the most expensive electricity. What decides a scheme here is the state of the covering and the load path, which is why the survey starts on the roof rather than in a spreadsheet.

859 kWh per kWp a year at this latitude, so a 500 kWp array models at about 430,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Nottingham
96 m phase 1
Drawing Nottingham unit
Roof 96 x 62 m
Array 500 kWp
Yield 430,000 kWh/yr
Scale 1:500 / Rev A / NG7

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Nottingham / Nottinghamshire
Midlands logistics park beside a motorway junction, several roofs carrying arrays
Industrial stock of the kind we survey across East Midlands.

Logistics solar PV across Nottinghamshire

What a roof in Nottingham actually generates

Modelled irradiation at this latitude is 1098 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 859 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 3 percent below the mean across the towns we cover, so the case here leans harder on how much you use on site rather than on raw generation.

Distribution stock around Nottingham clusters on M1 J24, M1 J25 and M1 J26, which is where the large single-let roofs are.

Surveys run across NG postcodes, NG7 outward.

Nottingham is the planning authority for most sites here, and the built-up area holds a population of about 299,790, which is large enough to pull in the regional distribution centres that come with the biggest roofs (ONS Census 2021 built-up areas).

FIG. 1 What a Nottingham roof makes, month by month

What a Nottingham roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

0255075100Jan: 22 kWh per kWpJanFeb: 37 kWh per kWpFebMar: 70 kWh per kWpMarApr: 100 kWh per kWpAprMay: 118 kWh per kWpMayJun: 115 kWh per kWpJunJul: 119 kWh per kWpJul119 kWh Aug: 104 kWh per kWpAugSep: 78 kWh per kWpSepOct: 48 kWh per kWpOctNov: 28 kWh per kWpNovDec: 19 kWh per kWpDec

Jul produces 6.3 times what Dec does on the same roof. A 500 kWp array here models at about 430,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2211,000
Feb3718,500
Mar7035,000
Apr10050,000
May11859,000
Jun11557,500
Jul11959,500
Aug10452,000
Sep7839,000
Oct4824,000
Nov2814,000
Dec199,500
Source: EU PVGIS v5.2
FIG. 2 Nottingham against the rest of Nottinghamshire
  • Newark874
  • Retford869
  • West Bridgford864
  • Nottingham859
  • Arnold857
  • Mansfield852
  • Worksop842

Nottingham ranks 4 of 7 towns we cover in Nottinghamshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 842 to 874, a spread of 32 kWh per kWp. Within Nottinghamshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through National Grid Electricity Distribution

Connections around Nottingham are handled by National Grid Electricity Distribution, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a warehouse uses most of what the roof makes during the working day.

Across Nottinghamshire the planning database records 164 solar schemes totalling 3700 MW, of which 35 are operational (REPD Q1 2026).

Solar already consented near NG7

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Willow Road - Roof mounted solar panels AC Gill Limited 0.35 MW Roof Operational
Games Workshop Euro Hub, Willow Road - Solar Panels Games Workshop 0.26 MW Roof Awaiting Construction
Madison Court, Derwent Way - Solar Panels Bluesky Student Madison Gardens Limited 0.18 MW Roof Awaiting Construction
Lenton Lane - Solar Panels Big Yellow Self Storage Limited 0.16 MW Roof Application Submitted
JK Foods UK, Bull Close Road - Solar Panels JK Foods UK Limited 0.31 MW Roof Awaiting Construction
Redfield Road - Solar Panels Private Developer 0.45 MW Roof Awaiting Construction
Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Nottingham

What would a 500 kWp array produce in Nottingham?
Yes, and the number matters more than the sunshine. At 859 kWh per kWp a year, a 500 kWp array on a Nottingham roof models at around 430,000 kWh. What changes the answer is how much of that you use on site rather than export. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection in Nottingham?
Applications go to National Grid Electricity Distribution, who run the network across Nottinghamshire. They decide the export limit, and we handle the G99 paperwork alongside the array design.
What does Nottingham require for rooftop solar?
Roof-mounted panels on a commercial building usually fall under permitted development, subject to the limits on projection above the roof plane and to the building not being listed or in a conservation area. We confirm the position with Nottingham before the design is finalised.
Has anyone near NG7 already done this?
The planning database records 6 solar schemes in this postcode district, 6 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.