The economics of a Newark rooftop array turn on how much of the generation the occupier uses on site. The survey measures the roof, not the postcode: cladding profile, purlin centres, remaining sheet life and the load the frame can take.
874 kWh per kWp a year at this latitude, so a 500 kWp array models at about 437,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in NewarkIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Warehouse rooftop solar across Nottinghamshire
What a roof in Newark actually generates
Modelled irradiation at this latitude is 1117 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 874 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.
Distribution stock around Newark clusters on A1, A46 and A17, which is where the large single-let roofs are.
Newark ranks 1 of 7 towns we cover in Nottinghamshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 842 to 874, a spread of 32 kWh per kWp. Within Nottinghamshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.
Grid connection through National Grid Electricity Distribution
Connections around Newark are handled by National Grid Electricity Distribution, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a warehouse uses most of what the roof makes during the working day.
Across Nottinghamshire the planning database records 164 solar schemes totalling 3700 MW, of which 35 are operational (REPD Q1 2026).
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Newark
- Is there enough sun in Newark to make this work?
- Modelled at 874 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 437,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once walkways and setbacks are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Who do we apply to for export in Newark?
- Capacity varies street by street, and only National Grid Electricity Distribution can answer it for your connection. We ask the question early, because an export-limited offer changes the design rather than killing the scheme.