warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Solar panels for warehouses in Towcester

Most of the industrial stock around Towcester carries a large, shallow-pitched roof that was never asked to do anything. The survey measures the roof, not the postcode: cladding profile, purlin centres, remaining sheet life and the load the frame can take.

897 kWh per kWp a year at this latitude, so a 500 kWp array models at about 449,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Towcester
96 m phase 1
Drawing Towcester unit
Roof 96 x 62 m
Array 500 kWp
Yield 449,000 kWh/yr
Scale 1:500 / Rev A / NN12

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Towcester / Northamptonshire
Midlands logistics park beside a motorway junction, several roofs carrying arrays
Industrial stock of the kind we survey across East Midlands.

Distribution centre solar across Northamptonshire

What a roof in Towcester actually generates

Modelled irradiation at this latitude is 1147 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 897 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.

We survey across the NN postcode area, starting from NN12.

West Northamptonshire is the planning authority for most sites here, and the built-up area holds a population of about 11,330, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Towcester roof makes, month by month

What a Towcester roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 24 kWh per kWpJanFeb: 38 kWh per kWpFebMar: 73 kWh per kWpMarApr: 103 kWh per kWpAprMay: 120 kWh per kWpMayJun: 123 kWh per kWpJunJul: 124 kWh per kWpJul124 kWh Aug: 105 kWh per kWpAugSep: 83 kWh per kWpSepOct: 51 kWh per kWpOctNov: 30 kWh per kWpNovDec: 21 kWh per kWpDec

Jul produces 5.9 times what Dec does on the same roof. A 500 kWp array here models at about 449,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2412,000
Feb3819,000
Mar7336,500
Apr10351,500
May12060,000
Jun12361,500
Jul12462,000
Aug10552,500
Sep8341,500
Oct5125,500
Nov3015,000
Dec2110,500
Source: EU PVGIS v5.2
FIG. 2 Towcester against the rest of Northamptonshire
  • Rushden900
  • Towcester897
  • Wellingborough896
  • Kettering895
  • Northampton893
  • Corby892
  • Daventry890

Towcester ranks 2 of 7 towns we cover in Northamptonshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 890 to 900, a spread of 10 kWh per kWp. Within Northamptonshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near NN12

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Yardley Road Solar Farm Solar 2 Limited 40 MW Ground Application Submitted
Silverstone Road, Biddlesden - Solar Panels Silverstone Circuits Limited 0.87 MW Roof Awaiting Construction
Whittlebury Park, High Street - Solar Panels Whittlebury Hall & Spa Limited 0.23 MW Roof Awaiting Construction
Whittlebury Park Golf & Country Club, High Street - Solar Panels Whittlebury Hall & Spa Limited 0.22 MW Roof Awaiting Construction
Porsche Centre, Old Tiffield Road - Solar Panels Sytner Group Limited 0.22 MW Roof Application Submitted

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Northamptonshire the planning database records 133 solar schemes totalling 1932 MW, of which 25 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Towcester

Is there enough sun in Towcester to make this work?
Modelled at 897 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 449,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once walkways and setbacks are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Who do we apply to for export in Towcester?
Capacity varies street by street, and only National Grid Electricity Distribution can answer it for your connection. We ask the question early, because an export-limited offer changes the design rather than killing the scheme.
Do we need planning permission in West Northamptonshire?
In most cases no, because roof-mounted panels on commercial buildings sit within permitted development. The exceptions are listed buildings, conservation areas and arrays that stand proud of the roof plane. We check with West Northamptonshire first either way.
Has anyone near NN12 already done this?
The planning database records 5 solar schemes in this postcode district, 4 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Northamptonshire locations