warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Solar panels for warehouses in Rushden

A Rushden warehouse roof sits idle through exactly the hours its occupier buys the most expensive electricity. We start with the covering and the structure, because a roof with five years left in it changes the answer entirely.

900 kWh per kWp a year at this latitude, so a 500 kWp array models at about 450,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Rushden
96 m phase 1
Drawing Rushden unit
Roof 96 x 62 m
Array 500 kWp
Yield 450,000 kWh/yr
Scale 1:500 / Rev A / NN10

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Rushden / Northamptonshire
Midlands logistics park beside a motorway junction, several roofs carrying arrays
Industrial stock of the kind we survey across East Midlands.

Logistics solar PV across Northamptonshire

What a roof in Rushden actually generates

Modelled irradiation at this latitude is 1151 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 900 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.

Distribution stock around Rushden clusters on A45 and A6, which is where the large single-let roofs are.

Surveys run across NN postcodes, NN10 outward.

Bedford is the planning authority for most sites here, and the built-up area holds a population of about 31,685, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Rushden roof makes, month by month

What a Rushden roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 24 kWh per kWpJanFeb: 39 kWh per kWpFebMar: 73 kWh per kWpMarApr: 103 kWh per kWpAprMay: 122 kWh per kWpMayJun: 123 kWh per kWpJunJul: 124 kWh per kWpJul124 kWh Aug: 106 kWh per kWpAugSep: 83 kWh per kWpSepOct: 51 kWh per kWpOctNov: 30 kWh per kWpNovDec: 21 kWh per kWpDec

Jul produces 5.9 times what Dec does on the same roof. A 500 kWp array here models at about 450,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2412,000
Feb3919,500
Mar7336,500
Apr10351,500
May12261,000
Jun12361,500
Jul12462,000
Aug10653,000
Sep8341,500
Oct5125,500
Nov3015,000
Dec2110,500
Source: EU PVGIS v5.2
FIG. 2 Rushden against the rest of Northamptonshire
  • Rushden900
  • Towcester897
  • Wellingborough896
  • Kettering895
  • Northampton893
  • Corby892
  • Daventry890

Rushden ranks 1 of 7 towns we cover in Northamptonshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 890 to 900, a spread of 10 kWh per kWp. Within Northamptonshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Northamptonshire the planning database records 133 solar schemes totalling 1932 MW, of which 25 are operational (REPD Q1 2026).

Solar already consented near NN10

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Goosey Lodge - Solar Farm Wykes Engineering Limited Goosey Lodge 10.5 MW Ground Awaiting Construction
Gooseys Lodge, Wymington Lane - Solar Farm Wykes Engineering Limited Goosey Lodge 10.38 MW Ground Awaiting Construction
Westwood A D Plant, Bedford Road - Solar Panels Biogen (UK) Ltd n/a Roof Application Submitted
Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Rushden

How much does a warehouse roof in Rushden generate?
The model gives 900 kWh for every kWp installed here, so 500 kWp comes out at about 450,000 kWh a year before any shading losses. You need roughly 1,485 sqm of clear roof to fit it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Does the grid around Rushden have capacity?
National Grid Electricity Distribution is the distribution network operator for Northamptonshire. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. We submit it as part of the design.
Is planning permission needed for panels on a Rushden unit?
Usually permitted development covers it. We still put the question to Bedford before design sign-off, and we tell you early if a full application is needed rather than discovering it late.
Has anyone near NN10 already done this?
The planning database records 3 solar schemes in this postcode district, 1 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Northamptonshire locations