warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Warehouse solar panels across Northamptonshire

We survey industrial and distribution roofs throughout Northamptonshire, model what each one can carry, and arrange the design, the grid application and the install through our MCS-certified partner.

Modelled yield
895 kWh/kWp/yr
Mean across Northamptonshire towns, EU PVGIS v5.2
Network operator
National Grid Electricity Distribution
G99 applications and export limits
Solar on record
133 schemes / 1932 MW
REPD Q1 2026, 25 operational
Towns covered
7
Surveys arranged county wide

What the data says about Northamptonshire

Modelled yield is consistent across Northamptonshire, from 890 kWh per kWp a year at Daventry to 900 at Rushden. At that spread, location is not what decides your payback here. Your consumption pattern is.

The larger roofs in Northamptonshire follow the freight routes. Across the towns we cover that means M1 J15, M1 J15a, M1 J16, A45, A43 and A14, which is where single-let distribution stock concentrates.

Named industrial estates across the county include DIRFT.

The government's planning database records 133 solar schemes in Northamptonshire totalling 1932 MW, of which 25 are already operational and 19 of the schemes in our covered postcode districts are roof mounted. Source: Renewable Energy Planning Database, Q1 2026.

Connections across the county run through National Grid Electricity Distribution. Anything above 3.68 kW per phase needs a G99 application, and the export limit they offer shapes the design, so we ask the question before the array is sized rather than after.

Towns in Northamptonshire

Book a survey in Northamptonshire

Send the postcode and the rough footprint. We come back with what the roof can carry, what it would generate against your consumption, and what the funding routes look like.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

All UK locations