warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Solar panels for warehouses in Sleaford

What makes a Sleaford scheme work is rarely the panels. It is the condition of the roof underneath them. Each survey records the cladding profile, the usable area once rooflights and plant are removed, and the export limit worth applying for.

898 kWh per kWp a year at this latitude, so a 500 kWp array models at about 449,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Sleaford
96 m phase 1
Drawing Sleaford unit
Roof 96 x 62 m
Array 500 kWp
Yield 449,000 kWh/yr
Scale 1:500 / Rev A / NG34

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Sleaford / Lincolnshire
Midlands logistics park beside a motorway junction, several roofs carrying arrays
Industrial stock of the kind we survey across East Midlands.

Logistics solar PV across Lincolnshire

What a roof in Sleaford actually generates

Modelled irradiation at this latitude is 1145 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 898 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.

Surveys run across NG postcodes, NG34 outward.

North Kesteven is the planning authority for most sites here, and the built-up area holds a population of about 18,030, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Sleaford roof makes, month by month

What a Sleaford roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 24 kWh per kWpJanFeb: 38 kWh per kWpFebMar: 74 kWh per kWpMarApr: 104 kWh per kWpAprMay: 123 kWh per kWpMayJun: 121 kWh per kWpJunJul: 124 kWh per kWpJul124 kWh Aug: 107 kWh per kWpAugSep: 83 kWh per kWpSepOct: 51 kWh per kWpOctNov: 30 kWh per kWpNovDec: 20 kWh per kWpDec

Jul produces 6.2 times what Dec does on the same roof. A 500 kWp array here models at about 449,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2412,000
Feb3819,000
Mar7437,000
Apr10452,000
May12361,500
Jun12160,500
Jul12462,000
Aug10753,500
Sep8341,500
Oct5125,500
Nov3015,000
Dec2010,000
Source: EU PVGIS v5.2
FIG. 2 Sleaford against the rest of Lincolnshire
  • Boston906
  • Spalding902
  • Sleaford898
  • Stamford896
  • Skegness894
  • Grantham886
  • Lincoln882
  • Gainsborough861

Sleaford ranks 3 of 8 towns we cover in Lincolnshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 861 to 906, a spread of 45 kWh per kWp. On a 500 kWp array that is about 22,500 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near NG34

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
White Cross Lane Nextpower SPV 5 Limited 25 MW Ground Under Construction
Gorse Lane Elgin Energy Esco 20 MW Ground Under Construction
Little Hale Fen - Solar Farm AGR Solar 2 Limited 49.99 MW Ground Awaiting Construction
Washdyke Farm, Billingborough Road - Solar farm GS Ignis Limited 27 MW Ground Awaiting Construction
Beacon Fen Energy Park Low Carbon Limited 400 MW Ground Application Submitted
Mareham Lane, Solar PV Panels Lighthouse Development Consulting 49.99 MW Ground Awaiting Construction

Grid connection through National Grid Electricity Distribution

Connections around Sleaford are handled by National Grid Electricity Distribution, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a warehouse uses most of what the roof makes during the working day.

Across Lincolnshire the planning database records 226 solar schemes totalling 7052 MW, of which 37 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Sleaford

Is there enough sun in Sleaford to make this work?
Modelled at 898 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 449,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once walkways and setbacks are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Who do we apply to for export in Sleaford?
Capacity varies street by street, and only National Grid Electricity Distribution can answer it for your connection. We ask the question early, because an export-limited offer changes the design rather than killing the scheme.
Do we need planning permission in North Kesteven?
In most cases no, because roof-mounted panels on commercial buildings sit within permitted development. The exceptions are listed buildings, conservation areas and arrays that stand proud of the roof plane. We check with North Kesteven first either way.
Has anyone near NG34 already done this?
The planning database records 6 solar schemes in this postcode district. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Lincolnshire locations