Warehouse solar panels across Lincolnshire
We survey industrial and distribution roofs throughout Lincolnshire, model what each one can carry, and arrange the design, the grid application and the install through our MCS-certified partner.
- Modelled yield
- 891 kWh/kWp/yr
- Mean across Lincolnshire towns, EU PVGIS v5.2
- Network operator
- National Grid Electricity Distribution
- G99 applications and export limits
- Solar on record
- 226 schemes / 7052 MW
- REPD Q1 2026, 37 operational
- Towns covered
- 8
- Surveys arranged county wide
What the data says about Lincolnshire
Modelled yield is not flat across Lincolnshire. Boston comes out at 906 kWh per kWp a year against 861 at Gainsborough, a spread of 45 kWh per kWp. On a 500 kWp array that difference is about 22,500 kWh a year, which is worth checking before you accept a generic saving figure.
The larger roofs in Lincolnshire follow the freight routes. Across the towns we cover that means A46, A15, A57, A1434, A16 and A52, which is where single-let distribution stock concentrates.
The government's planning database records 226 solar schemes in Lincolnshire totalling 7052 MW, of which 37 are already operational and 21 of the schemes in our covered postcode districts are roof mounted. Source: Renewable Energy Planning Database, Q1 2026.
Connections across the county run through National Grid Electricity Distribution. Anything above 3.68 kW per phase needs a G99 application, and the export limit they offer shapes the design, so we ask the question before the array is sized rather than after.
- Lincoln 882 kWh/kWp
- Boston 906 kWh/kWp
- Grantham 886 kWh/kWp
- Spalding 902 kWh/kWp
- Gainsborough 861 kWh/kWp
- Stamford 896 kWh/kWp
- Skegness 894 kWh/kWp
- Sleaford 898 kWh/kWp
Book a survey in Lincolnshire
Send the postcode and the rough footprint. We come back with what the roof can carry, what it would generate against your consumption, and what the funding routes look like.