Solar panels for warehouses in Grantham

The economics of a Grantham rooftop array turn on how much of the generation the occupier uses on site. The survey measures the roof, not the postcode: cladding profile, purlin centres, remaining sheet life and the load the frame can take.

886 kWh per kWp a year at this latitude, so a 500 kWp array models at about 443,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Grantham
96 m phase 1
Drawing Grantham unit
Roof 96 x 62 m
Array 500 kWp
Yield 443,000 kWh/yr
Scale 1:500 / Rev A / NG31

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Grantham / Lincolnshire
Midlands logistics park beside a motorway junction, several roofs carrying arrays
Industrial stock of the kind we survey across East Midlands.

Warehouse rooftop solar across Lincolnshire

What a roof in Grantham actually generates

Modelled irradiation at this latitude is 1130 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 886 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.

Distribution stock around Grantham clusters on A1, A52 and A607, which is where the large single-let roofs are.

Most of the units we look at here sit in the NG postcode area.

South Kesteven is the planning authority for most sites here, and the built-up area holds a population of about 44,905, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Grantham roof makes, month by month

What a Grantham roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 23 kWh per kWpJanFeb: 37 kWh per kWpFebMar: 73 kWh per kWpMarApr: 104 kWh per kWpAprMay: 121 kWh per kWpMayJun: 119 kWh per kWpJunJul: 122 kWh per kWpJul122 kWh Aug: 105 kWh per kWpAugSep: 82 kWh per kWpSepOct: 50 kWh per kWpOctNov: 29 kWh per kWpNovDec: 20 kWh per kWpDec

Jul produces 6.1 times what Dec does on the same roof. A 500 kWp array here models at about 443,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2311,500
Feb3718,500
Mar7336,500
Apr10452,000
May12160,500
Jun11959,500
Jul12261,000
Aug10552,500
Sep8241,000
Oct5025,000
Nov2914,500
Dec2010,000
Source: EU PVGIS v5.2
FIG. 2 Grantham against the rest of Lincolnshire
  • Boston906
  • Spalding902
  • Sleaford898
  • Stamford896
  • Skegness894
  • Grantham886
  • Lincoln882
  • Gainsborough861

Grantham ranks 6 of 8 towns we cover in Lincolnshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 861 to 906, a spread of 45 kWh per kWp. On a 500 kWp array that is about 22,500 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near NG31

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Gonerby Moor, Great Gonerby - Solar Farm Lightsource BP 49.99 MW Ground Awaiting Construction
BGB Engineering Limited - Solar Panels Scheme BGB Innovation 0.21 MW Roof Awaiting Construction
Ash Tree Solar Farm & Battery Storage Low Carbon Limited 49.9 MW Ground Awaiting Construction
Grantham Meres Leisure Centre, Trent Road - Solar PV Panels South Kesteven District Council 0.2 MW Roof Application Submitted
Grantham Meres Leisure Centre, Trent Road - Solar PV System Grantham Meres Leisure Centre 0.25 MW Roof Application Submitted
MV Fruehauf Limited, Houghton Road - Solar Panels MV Fruehauf Limited 0.48 MW Roof Application Submitted

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution operates the distribution network across Lincolnshire, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Lincolnshire the planning database records 226 solar schemes totalling 7052 MW, of which 37 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Grantham

What would a 500 kWp array produce in Grantham?
Yes, and the number matters more than the sunshine. At 886 kWh per kWp a year, a 500 kWp array on a Grantham roof models at around 443,000 kWh. What changes the answer is how much of that you use on site rather than export. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection in Grantham?
Applications go to National Grid Electricity Distribution, who run the network across Lincolnshire. They decide the export limit, and we handle the G99 paperwork alongside the array design.
What does South Kesteven require for rooftop solar?
Roof-mounted panels on a commercial building usually fall under permitted development, subject to the limits on projection above the roof plane and to the building not being listed or in a conservation area. We confirm the position with South Kesteven before the design is finalised.
Has anyone near NG31 already done this?
The planning database records 6 solar schemes in this postcode district, 4 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.