warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Solar panels for warehouses in Tunbridge Wells

The economics of a Tunbridge Wells rooftop array turn on how much of the generation the occupier uses on site. The survey measures the roof, not the postcode: cladding profile, purlin centres, remaining sheet life and the load the frame can take.

930 kWh per kWp a year at this latitude, so a 500 kWp array models at about 465,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Tunbridge Wells
96 m phase 1
Drawing Tunbridge Wells unit
Roof 96 x 62 m
Array 500 kWp
Yield 465,000 kWh/yr
Scale 1:500 / Rev A / Kent

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Tunbridge Wells / Kent
Aerial view of an industrial estate where some warehouse roofs carry solar arrays and others are bare steel
Industrial stock of the kind we survey across Kent.

Warehouse rooftop solar across Kent

What a roof in Tunbridge Wells actually generates

Modelled irradiation at this latitude is 1193 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 930 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 5 percent above the mean across the towns we cover, which is as good as UK rooftop gets outside the south coast.

FIG. 1 What a Tunbridge Wells roof makes, month by month

What a Tunbridge Wells roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 25 kWh per kWpJanFeb: 39 kWh per kWpFebMar: 74 kWh per kWpMarApr: 108 kWh per kWpAprMay: 123 kWh per kWpMayJun: 130 kWh per kWpJun130 kWh Jul: 130 kWh per kWpJulAug: 110 kWh per kWpAugSep: 85 kWh per kWpSepOct: 53 kWh per kWpOctNov: 31 kWh per kWpNovDec: 23 kWh per kWpDec

Jun produces 5.7 times what Dec does on the same roof. A 500 kWp array here models at about 465,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2512,500
Feb3919,500
Mar7437,000
Apr10854,000
May12361,500
Jun13065,000
Jul13065,000
Aug11055,000
Sep8542,500
Oct5326,500
Nov3115,500
Dec2311,500
Source: EU PVGIS v5.2
FIG. 2 Tunbridge Wells against the rest of Kent
  • Ashford983
  • Dover972
  • Canterbury961
  • Maidstone930
  • Tunbridge Wells930
  • Tonbridge927
  • Gravesend926
  • Chatham920
  • Sevenoaks920

Tunbridge Wells ranks 7 of 12 towns we cover in Kent on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 915 to 990, a spread of 75 kWh per kWp. On a 500 kWp array that is about 37,500 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through UK Power Networks

Connections around Tunbridge Wells are handled by UK Power Networks, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a warehouse uses most of what the roof makes during the working day.

Across Kent the planning database records 237 solar schemes totalling 2072 MW, of which 45 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Tunbridge Wells

How much does a warehouse roof in Tunbridge Wells generate?
The model gives 930 kWh for every kWp installed here, so 500 kWp comes out at about 465,000 kWh a year before any shading losses. You need roughly 1,485 sqm of clear roof to fit it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Does the grid around Tunbridge Wells have capacity?
UK Power Networks is the distribution network operator for Kent. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. We submit it as part of the design.

Nearby

All Kent locations