Solar panels for warehouses in Gravesend

Sheds around Gravesend tend to have more roof than the business has any other use for. What decides a scheme here is the state of the covering and the load path, which is why the survey starts on the roof rather than in a spreadsheet.

926 kWh per kWp a year at this latitude, so a 500 kWp array models at about 463,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Gravesend
96 m phase 1
Drawing Gravesend unit
Roof 96 x 62 m
Array 500 kWp
Yield 463,000 kWh/yr
Scale 1:500 / Rev A / DA12

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Gravesend / Kent
Home Counties distribution estate with solar arrays on several unit roofs
Industrial stock of the kind we survey across South East.

Distribution centre solar across Kent

What a roof in Gravesend actually generates

Modelled irradiation at this latitude is 1189 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 926 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 5 percent above the mean across the towns we cover, which is as good as UK rooftop gets outside the south coast.

Distribution stock around Gravesend clusters on A2 and M25 J2, which is where the large single-let roofs are.

We survey across the DA postcode area, starting from DA12.

Gravesham is the planning authority for most sites here, and the built-up area holds a population of about 58,105, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Gravesend roof makes, month by month

What a Gravesend roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 25 kWh per kWpJanFeb: 38 kWh per kWpFebMar: 73 kWh per kWpMarApr: 106 kWh per kWpAprMay: 123 kWh per kWpMayJun: 128 kWh per kWpJunJul: 130 kWh per kWpJul130 kWh Aug: 109 kWh per kWpAugSep: 86 kWh per kWpSepOct: 54 kWh per kWpOctNov: 32 kWh per kWpNovDec: 22 kWh per kWpDec

Jul produces 5.9 times what Dec does on the same roof. A 500 kWp array here models at about 463,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2512,500
Feb3819,000
Mar7336,500
Apr10653,000
May12361,500
Jun12864,000
Jul13065,000
Aug10954,500
Sep8643,000
Oct5427,000
Nov3216,000
Dec2211,000
Source: EU PVGIS v5.2
FIG. 2 Gravesend against the rest of Kent
  • Dover972
  • Canterbury961
  • Maidstone930
  • Tunbridge Wells930
  • Tonbridge927
  • Gravesend926
  • Chatham920
  • Sevenoaks920
  • Dartford915

Gravesend ranks 9 of 12 towns we cover in Kent on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 915 to 990, a spread of 75 kWh per kWp. On a 500 kWp array that is about 37,500 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through UK Power Networks

UK Power Networks operates the distribution network across Kent, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Kent the planning database records 237 solar schemes totalling 2072 MW, of which 45 are operational (REPD Q1 2026).

Solar already consented near DA12

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Lion Business Park, Dering Way - Solar panels Industrials Propco 1 Limited 0.17 MW Roof Application Submitted
Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Gravesend

Is there enough sun in Gravesend to make this work?
Modelled at 926 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 463,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once walkways and setbacks are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Who do we apply to for export in Gravesend?
Capacity varies street by street, and only UK Power Networks can answer it for your connection. We ask the question early, because an export-limited offer changes the design rather than killing the scheme.
Do we need planning permission in Gravesham?
In most cases no, because roof-mounted panels on commercial buildings sit within permitted development. The exceptions are listed buildings, conservation areas and arrays that stand proud of the roof plane. We check with Gravesham first either way.