warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Solar panels for warehouses in Stevenage

Most of the industrial stock around Stevenage carries a large, shallow-pitched roof that was never asked to do anything. The survey measures the roof, not the postcode: cladding profile, purlin centres, remaining sheet life and the load the frame can take.

901 kWh per kWp a year at this latitude, so a 500 kWp array models at about 451,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Stevenage
96 m phase 1
Drawing Stevenage unit
Roof 96 x 62 m
Array 500 kWp
Yield 451,000 kWh/yr
Scale 1:500 / Rev A / SG1

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Stevenage / Hertfordshire
Distribution estate in the east of England with solar arrays on several roofs
Industrial stock of the kind we survey across East of England.

Distribution centre solar across Hertfordshire

What a roof in Stevenage actually generates

Modelled irradiation at this latitude is 1153 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 901 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.

Distribution stock around Stevenage clusters on A1(M) J7, A1(M) J8 and A602, which is where the large single-let roofs are.

We survey across the SG postcode area, starting from SG1.

Stevenage is the planning authority for most sites here, and the built-up area holds a population of about 94,470, the size that tends to be served by mid-box last-mile units rather than national hubs (ONS Census 2021 built-up areas).

FIG. 1 What a Stevenage roof makes, month by month

What a Stevenage roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 24 kWh per kWpJanFeb: 39 kWh per kWpFebMar: 74 kWh per kWpMarApr: 104 kWh per kWpAprMay: 120 kWh per kWpMayJun: 124 kWh per kWpJunJul: 125 kWh per kWpJul125 kWh Aug: 106 kWh per kWpAugSep: 84 kWh per kWpSepOct: 51 kWh per kWpOctNov: 30 kWh per kWpNovDec: 21 kWh per kWpDec

Jul produces 6.0 times what Dec does on the same roof. A 500 kWp array here models at about 451,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2412,000
Feb3919,500
Mar7437,000
Apr10452,000
May12060,000
Jun12462,000
Jul12562,500
Aug10653,000
Sep8442,000
Oct5125,500
Nov3015,000
Dec2110,500
Source: EU PVGIS v5.2
FIG. 2 Stevenage against the rest of Hertfordshire
  • Bishop's Stortford911
  • Stevenage901
  • St Albans901
  • Hatfield901
  • Hertford901
  • Welwyn Garden City899
  • Watford898
  • Harpenden896
  • Hemel Hempstead895

Stevenage ranks 2 of 10 towns we cover in Hertfordshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 895 to 911, a spread of 16 kWh per kWp. Within Hertfordshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near SG1

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Flamingo House M & G 1 MW Roof Operational
Tesco Store The Forum Stevenage Push Energy 0.4 MW Roof Awaiting Construction
Stevenage Leisure Park, Kings Way - Solar PV Panels Hollywood Bowl Group 0.22 MW Roof Awaiting Construction
Roaring Meg Retail Park, London Road - Solar Panels TK Maxx 0.29 MW Roof Awaiting Construction
David Lloyd Fitness Centre, Kings Way - Solar Panels David Lloyd Leisure Limited n/a Roof Awaiting Construction
Sainsburys, Hitchin Road - Solar Panels Sainsburys Supermarkets Limited 0.31 MW Roof Awaiting Construction

Grid connection through UK Power Networks

UK Power Networks is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Hertfordshire the planning database records 119 solar schemes totalling 844 MW, of which 12 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Stevenage

How much does a warehouse roof in Stevenage generate?
The model gives 901 kWh for every kWp installed here, so 500 kWp comes out at about 451,000 kWh a year before any shading losses. You need roughly 1,485 sqm of clear roof to fit it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Does the grid around Stevenage have capacity?
UK Power Networks is the distribution network operator for Hertfordshire. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. We submit it as part of the design.
Is planning permission needed for panels on a Stevenage unit?
Usually permitted development covers it. We still put the question to Stevenage before design sign-off, and we tell you early if a full application is needed rather than discovering it late.
Has anyone near SG1 already done this?
The planning database records 6 solar schemes in this postcode district, 6 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Hertfordshire locations