Solar panels for warehouses in Hemel Hempstead

Sheds around Hemel Hempstead tend to have more roof than the business has any other use for. What decides a scheme here is the state of the covering and the load path, which is why the survey starts on the roof rather than in a spreadsheet.

895 kWh per kWp a year at this latitude, so a 500 kWp array models at about 448,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Hemel Hempstead
96 m phase 1
Drawing Hemel Hempstead unit
Roof 96 x 62 m
Array 500 kWp
Yield 448,000 kWh/yr
Scale 1:500 / Rev A / HP2

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Hemel Hempstead / Hertfordshire
Distribution estate in the east of England with solar arrays on several roofs
Industrial stock of the kind we survey across East of England.

Distribution centre solar across Hertfordshire

What a roof in Hemel Hempstead actually generates

Modelled irradiation at this latitude is 1146 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 895 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.

Distribution stock around Hemel Hempstead clusters on M1 J8, M1 J9 and A41, which is where the large single-let roofs are.

We survey across the HP postcode area, starting from HP2.

Dacorum is the planning authority for most sites here, and the built-up area holds a population of about 95,985, the size that tends to be served by mid-box last-mile units rather than national hubs (ONS Census 2021 built-up areas).

FIG. 1 What a Hemel Hempstead roof makes, month by month

What a Hemel Hempstead roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 25 kWh per kWpJanFeb: 39 kWh per kWpFebMar: 73 kWh per kWpMarApr: 104 kWh per kWpAprMay: 119 kWh per kWpMayJun: 123 kWh per kWpJunJul: 125 kWh per kWpJul125 kWh Aug: 105 kWh per kWpAugSep: 82 kWh per kWpSepOct: 51 kWh per kWpOctNov: 30 kWh per kWpNovDec: 21 kWh per kWpDec

Jul produces 6.0 times what Dec does on the same roof. A 500 kWp array here models at about 448,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2512,500
Feb3919,500
Mar7336,500
Apr10452,000
May11959,500
Jun12361,500
Jul12562,500
Aug10552,500
Sep8241,000
Oct5125,500
Nov3015,000
Dec2110,500
Source: EU PVGIS v5.2
FIG. 2 Hemel Hempstead against the rest of Hertfordshire
  • Stevenage901
  • St Albans901
  • Hatfield901
  • Hertford901
  • Welwyn Garden City899
  • Watford898
  • Harpenden896
  • Hemel Hempstead895
  • Borehamwood895

Hemel Hempstead ranks 9 of 10 towns we cover in Hertfordshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 895 to 911, a spread of 16 kWh per kWp. Within Hertfordshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through UK Power Networks

Connections around Hemel Hempstead are handled by UK Power Networks, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a warehouse uses most of what the roof makes during the working day.

Across Hertfordshire the planning database records 119 solar schemes totalling 844 MW, of which 12 are operational (REPD Q1 2026).

Solar already consented near HP2

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Iron Mountain Site Iron Mountain 0.3 MW Roof Operational
Amazon Boundary Way Amazon UK Services / Push Energy 2 MW Roof Planning Permission Expired
G Park Maxted Road - Solar Panels BBUKPF 1.25 MW Roof Awaiting Construction
Century House, Maylands Avenue - Solar PV Panels Smiths Detection Limited 0.72 MW Roof Awaiting Construction
G Park, Maxted Road - Solar Panels ABRDN 0.77 MW Roof Awaiting Construction
Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Hemel Hempstead

What would a 500 kWp array produce in Hemel Hempstead?
Yes, and the number matters more than the sunshine. At 895 kWh per kWp a year, a 500 kWp array on a Hemel Hempstead roof models at around 448,000 kWh. What changes the answer is how much of that you use on site rather than export. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection in Hemel Hempstead?
Applications go to UK Power Networks, who run the network across Hertfordshire. They decide the export limit, and we handle the G99 paperwork alongside the array design.
What does Dacorum require for rooftop solar?
Roof-mounted panels on a commercial building usually fall under permitted development, subject to the limits on projection above the roof plane and to the building not being listed or in a conservation area. We confirm the position with Dacorum before the design is finalised.
Has anyone near HP2 already done this?
The planning database records 5 solar schemes in this postcode district, 5 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.