warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Solar panels for warehouses in Hatfield

Sheds around Hatfield tend to have more roof than the business has any other use for. We start with the covering and the structure, because a roof with five years left in it changes the answer entirely.

901 kWh per kWp a year at this latitude, so a 500 kWp array models at about 451,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Hatfield
96 m phase 1
Drawing Hatfield unit
Roof 96 x 62 m
Array 500 kWp
Yield 451,000 kWh/yr
Scale 1:500 / Rev A / AL10

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Hatfield / Hertfordshire
Distribution estate in the east of England with solar arrays on several roofs
Industrial stock of the kind we survey across East of England.

Distribution centre solar across Hertfordshire

What a roof in Hatfield actually generates

Modelled irradiation at this latitude is 1155 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 901 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.

Distribution stock around Hatfield clusters on A1(M) J3, A1(M) J4 and A414, which is where the large single-let roofs are.

We survey across the AL postcode area, starting from AL10.

Welwyn Hatfield is the planning authority for most sites here, and the built-up area holds a population of about 41,560, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Hatfield roof makes, month by month

What a Hatfield roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 25 kWh per kWpJanFeb: 38 kWh per kWpFebMar: 73 kWh per kWpMarApr: 104 kWh per kWpAprMay: 120 kWh per kWpMayJun: 124 kWh per kWpJunJul: 125 kWh per kWpJul125 kWh Aug: 106 kWh per kWpAugSep: 84 kWh per kWpSepOct: 51 kWh per kWpOctNov: 31 kWh per kWpNovDec: 21 kWh per kWpDec

Jul produces 6.0 times what Dec does on the same roof. A 500 kWp array here models at about 451,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2512,500
Feb3819,000
Mar7336,500
Apr10452,000
May12060,000
Jun12462,000
Jul12562,500
Aug10653,000
Sep8442,000
Oct5125,500
Nov3115,500
Dec2110,500
Source: EU PVGIS v5.2
FIG. 2 Hatfield against the rest of Hertfordshire
  • Bishop's Stortford911
  • Stevenage901
  • St Albans901
  • Hatfield901
  • Hertford901
  • Welwyn Garden City899
  • Watford898
  • Harpenden896
  • Hemel Hempstead895

Hatfield ranks 4 of 10 towns we cover in Hertfordshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 895 to 911, a spread of 16 kWh per kWp. Within Hertfordshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through UK Power Networks

Connections around Hatfield are handled by UK Power Networks, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a warehouse uses most of what the roof makes during the working day.

Across Hertfordshire the planning database records 119 solar schemes totalling 844 MW, of which 12 are operational (REPD Q1 2026).

Solar already consented near AL10

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Computacenter Warehouse Computacenter UK 2 MW Roof Under Construction
Gypsy Moth Avenue - Solar Array Aberdeen Standard Investment 1.2 MW Roof Awaiting Construction
Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Hatfield

How much does a warehouse roof in Hatfield generate?
The model gives 901 kWh for every kWp installed here, so 500 kWp comes out at about 451,000 kWh a year before any shading losses. You need roughly 1,485 sqm of clear roof to fit it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Does the grid around Hatfield have capacity?
UK Power Networks is the distribution network operator for Hertfordshire. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. We submit it as part of the design.
Is planning permission needed for panels on a Hatfield unit?
Usually permitted development covers it. We still put the question to Welwyn Hatfield before design sign-off, and we tell you early if a full application is needed rather than discovering it late.
Has anyone near AL10 already done this?
The planning database records 2 solar schemes in this postcode district, 2 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Hertfordshire locations