warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Solar panels for warehouses in Long Eaton

What makes a Long Eaton scheme work is rarely the panels. It is the condition of the roof underneath them. Each survey records the cladding profile, the usable area once rooflights and plant are removed, and the export limit worth applying for.

866 kWh per kWp a year at this latitude, so a 500 kWp array models at about 433,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Long Eaton
96 m phase 1
Drawing Long Eaton unit
Roof 96 x 62 m
Array 500 kWp
Yield 433,000 kWh/yr
Scale 1:500 / Rev A / NG10

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Long Eaton / Derbyshire
Midlands logistics park beside a motorway junction, several roofs carrying arrays
Industrial stock of the kind we survey across East Midlands.

Logistics solar PV across Derbyshire

What a roof in Long Eaton actually generates

Modelled irradiation at this latitude is 1105 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 866 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.

Surveys run across NG postcodes, NG10 outward.

Erewash is the planning authority for most sites here, and the built-up area holds a population of about 37,820, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Long Eaton roof makes, month by month

What a Long Eaton roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 22 kWh per kWpJanFeb: 37 kWh per kWpFebMar: 71 kWh per kWpMarApr: 101 kWh per kWpAprMay: 119 kWh per kWpMayJun: 117 kWh per kWpJunJul: 121 kWh per kWpJul121 kWh Aug: 104 kWh per kWpAugSep: 79 kWh per kWpSepOct: 48 kWh per kWpOctNov: 28 kWh per kWpNovDec: 20 kWh per kWpDec

Jul produces 6.0 times what Dec does on the same roof. A 500 kWp array here models at about 433,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2211,000
Feb3718,500
Mar7135,500
Apr10150,500
May11959,500
Jun11758,500
Jul12160,500
Aug10452,000
Sep7939,500
Oct4824,000
Nov2814,000
Dec2010,000
Source: EU PVGIS v5.2
FIG. 2 Long Eaton against the rest of Derbyshire
  • Long Eaton866
  • Derby862
  • Swadlincote856
  • Ilkeston855
  • Belper850
  • Matlock844
  • Chesterfield843
  • Buxton805

Long Eaton ranks 1 of 8 towns we cover in Derbyshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 805 to 866, a spread of 61 kWh per kWp. On a 500 kWp array that is about 30,500 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution operates the distribution network across Derbyshire, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Derbyshire the planning database records 144 solar schemes totalling 904 MW, of which 27 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Long Eaton

Is there enough sun in Long Eaton to make this work?
Modelled at 866 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 433,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once walkways and setbacks are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Who do we apply to for export in Long Eaton?
Capacity varies street by street, and only National Grid Electricity Distribution can answer it for your connection. We ask the question early, because an export-limited offer changes the design rather than killing the scheme.
Do we need planning permission in Erewash?
In most cases no, because roof-mounted panels on commercial buildings sit within permitted development. The exceptions are listed buildings, conservation areas and arrays that stand proud of the roof plane. We check with Erewash first either way.

Nearby

All Derbyshire locations