Solar panels for warehouses in Swadlincote
Sheds around Swadlincote tend to have more roof than the business has any other use for. What decides a scheme here is the state of the covering and the load path, which is why the survey starts on the roof rather than in a spreadsheet.
856 kWh per kWp a year at this latitude, so a 500 kWp array models at about 428,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in SwadlincoteIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Distribution centre solar across Derbyshire
What a roof in Swadlincote actually generates
Modelled irradiation at this latitude is 1094 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 856 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 3 percent below the mean across the towns we cover, so the case here leans harder on how much you use on site rather than on raw generation.
Distribution stock around Swadlincote clusters on A50, A511 and A444, which is where the large single-let roofs are.
We survey across the DE postcode area, starting from DE11.
South Derbyshire is the planning authority for most sites here, and the built-up area holds a population of about 34,565, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).
Swadlincote ranks 3 of 8 towns we cover in Derbyshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 805 to 866, a spread of 61 kWh per kWp. On a 500 kWp array that is about 30,500 kWh a year between the strongest and weakest town in the county.
Grid connection through National Grid Electricity Distribution
Connections around Swadlincote are handled by National Grid Electricity Distribution, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a warehouse uses most of what the roof makes during the working day.
Across Derbyshire the planning database records 144 solar schemes totalling 904 MW, of which 27 are operational (REPD Q1 2026).
Solar already consented near DE11
From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.
| Scheme | Operator | Capacity | Mounting | Status |
|---|---|---|---|---|
| Short Hazel Solar Farm | Pearmat Solar | 5 MW | Ground | Operational |
| Land at Sunnyside Court | Ethical Power | 4.9 MW | Ground | Application Refused |
| Brizlincote Hall Solar Farm | Vortex (formerly SunEdison) | 5 MW | Ground | Application Refused |
| Park Road | Earthworm Energy | 5 MW | Ground | Application Refused |
| Lullington Solar Park | Lullington Solar Park Limited | 49.9 MW | Ground | Revised |
| Kiln Way, Woodville - Solar Photovoltaic Panels | Cactus Energy | 0.18 MW | Roof | Revised |
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Swadlincote
- Is there enough sun in Swadlincote to make this work?
- Modelled at 856 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 428,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once walkways and setbacks are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Who do we apply to for export in Swadlincote?
- Capacity varies street by street, and only National Grid Electricity Distribution can answer it for your connection. We ask the question early, because an export-limited offer changes the design rather than killing the scheme.
- Do we need planning permission in South Derbyshire?
- In most cases no, because roof-mounted panels on commercial buildings sit within permitted development. The exceptions are listed buildings, conservation areas and arrays that stand proud of the roof plane. We check with South Derbyshire first either way.
- Has anyone near DE11 already done this?
- The planning database records 6 solar schemes in this postcode district, 1 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.