What makes a Filton scheme work is rarely the panels. It is the condition of the roof underneath them. The survey measures the roof, not the postcode: cladding profile, purlin centres, remaining sheet life and the load the frame can take.
895 kWh per kWp a year at this latitude, so a 500 kWp array models at about 448,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in FiltonIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Logistics solar PV across Bristol
What a roof in Filton actually generates
Modelled irradiation at this latitude is 1147 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 895 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.
Surveys run across BS postcodes, BS34 outward.
Bristol, City of is the planning authority for most sites here, and the built-up area holds a population of about 10,960, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).
Filton ranks 5 of 5 towns we cover in Bristol on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 895 to 908, a spread of 13 kWh per kWp. Within Bristol that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.
Solar already consented near BS34
From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.
| Scheme | Operator | Capacity | Mounting | Status |
|---|---|---|---|---|
| Amcor Flexibles | Langley Eco | 1.7 MW | Roof | Operational |
| Rolls Royce Filton Campus Building 184 | Innogy (previously BELECTRIC Solar) | 1.4 MW | Roof | Operational |
| Rolls Royce Filton Campus Building 185 | Innogy (previously BELECTRIC Solar) | 1.8 MW | Roof | Operational |
| Carshop Bristol, Bolingbroke Way - Solar Panels | Sytner Group Limited | 0.15 MW | Roof | Awaiting Construction |
| Dunelm, Centaurus Road - Solar Panels | Dunelm Group Limited | 0.18 MW | Roof | Awaiting Construction |
| Abbey Wood Retail Park, Station Road - Solar Panels | Invesco Real Estate | 0.32 MW | Roof | Awaiting Construction |
Grid connection through National Grid Electricity Distribution
Connections around Filton are handled by National Grid Electricity Distribution, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a warehouse uses most of what the roof makes during the working day.
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Filton
- How much does a warehouse roof in Filton generate?
- The model gives 895 kWh for every kWp installed here, so 500 kWp comes out at about 448,000 kWh a year before any shading losses. You need roughly 1,485 sqm of clear roof to fit it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Does the grid around Filton have capacity?
- National Grid Electricity Distribution is the distribution network operator for Bristol. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. We submit it as part of the design.
- Is planning permission needed for panels on a Filton unit?
- Usually permitted development covers it. We still put the question to Bristol, City of before design sign-off, and we tell you early if a full application is needed rather than discovering it late.
- Has anyone near BS34 already done this?
- The planning database records 6 solar schemes in this postcode district, 6 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.