Warehouse solar panels across Bristol
We survey industrial and distribution roofs throughout Bristol, model what each one can carry, and arrange the design, the grid application and the install through our MCS-certified partner.
- Modelled yield
- 903 kWh/kWp/yr
- Mean across Bristol towns, EU PVGIS v5.2
- Network operator
- National Grid Electricity Distribution
- G99 applications and export limits
- Solar on record
- 0 schemes / 0 MW
- REPD Q1 2026, 0 operational
- Towns covered
- 2
- Surveys arranged county wide
What the data says about Bristol
Modelled yield is consistent across Bristol, from 895 kWh per kWp a year at Filton to 908 at Bishopston. At that spread, location is not what decides your payback here. Your consumption pattern is.
The planning database records no solar schemes for Bristol at present, which usually means the local stock has gone in below the reporting threshold rather than that nothing has been built. Roof arrays under 1 MW frequently never appear in it.
Connections across the county run through National Grid Electricity Distribution. Anything above 3.68 kW per phase needs a G99 application, and the export limit they offer shapes the design, so we ask the question before the array is sized rather than after.
- Keynsham 902 kWh/kWp
- Filton 895 kWh/kWp
- Bedminster 906 kWh/kWp
- Bishopston 908 kWh/kWp
- Bristol City Centre
- Hengrove 903 kWh/kWp
Book a survey in Bristol
Send the postcode and the rough footprint. We come back with what the roof can carry, what it would generate against your consumption, and what the funding routes look like.