Solar panels for warehouses in Bradford

Most of the industrial stock around Bradford carries a large, shallow-pitched roof that was never asked to do anything. The survey measures the roof, not the postcode: cladding profile, purlin centres, remaining sheet life and the load the frame can take.

817 kWh per kWp a year at this latitude, so a 500 kWp array models at about 409,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Bradford
96 m phase 1
Drawing Bradford unit
Roof 96 x 62 m
Array 500 kWp
Yield 409,000 kWh/yr
Scale 1:500 / Rev A / BD7

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Bradford / West Yorkshire
West Yorkshire industrial park below moorland, with solar on several roofs
Industrial stock of the kind we survey across Yorkshire and The Humber.

Distribution centre solar across West Yorkshire

What a roof in Bradford actually generates

Modelled irradiation at this latitude is 1041 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 817 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 8 percent below the mean across the towns we cover, so the case here leans harder on how much you use on site rather than on raw generation.

Distribution stock around Bradford clusters on M606 J1, M62 J26 and A647, which is where the large single-let roofs are.

We survey across the BD postcode area, starting from BD7.

Bradford is the planning authority for most sites here, and the built-up area holds a population of about 333,950, which is large enough to pull in the regional distribution centres that come with the biggest roofs (ONS Census 2021 built-up areas).

FIG. 1 What a Bradford roof makes, month by month

What a Bradford roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

0255075100Jan: 19 kWh per kWpJanFeb: 35 kWh per kWpFebMar: 67 kWh per kWpMarApr: 96 kWh per kWpAprMay: 116 kWh per kWpMay116 kWh Jun: 111 kWh per kWpJunJul: 115 kWh per kWpJulAug: 99 kWh per kWpAugSep: 73 kWh per kWpSepOct: 44 kWh per kWpOctNov: 25 kWh per kWpNovDec: 17 kWh per kWpDec

May produces 6.8 times what Dec does on the same roof. A 500 kWp array here models at about 409,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan199,500
Feb3517,500
Mar6733,500
Apr9648,000
May11658,000
Jun11155,500
Jul11557,500
Aug9949,500
Sep7336,500
Oct4422,000
Nov2512,500
Dec178,500
Source: EU PVGIS v5.2
FIG. 2 Bradford against the rest of West Yorkshire
  • Pontefract846
  • Wakefield837
  • Dewsbury835
  • Leeds830
  • Bradford817
  • Ilkley813
  • Halifax812
  • Huddersfield811

Bradford ranks 5 of 8 towns we cover in West Yorkshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 811 to 846, a spread of 35 kWh per kWp. Within West Yorkshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near BD7

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
University of Bradford, Richmond Road - Solar Panels Bradford University 0.4 MW Roof Awaiting Construction

Grid connection through Northern Powergrid

Northern Powergrid is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across West Yorkshire the planning database records 170 solar schemes totalling 550 MW, of which 8 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Bradford

What would a 500 kWp array produce in Bradford?
Yes, and the number matters more than the sunshine. At 817 kWh per kWp a year, a 500 kWp array on a Bradford roof models at around 409,000 kWh. What changes the answer is how much of that you use on site rather than export. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection in Bradford?
Applications go to Northern Powergrid, who run the network across West Yorkshire. They decide the export limit, and we handle the G99 paperwork alongside the array design.
What does Bradford require for rooftop solar?
Roof-mounted panels on a commercial building usually fall under permitted development, subject to the limits on projection above the roof plane and to the building not being listed or in a conservation area. We confirm the position with Bradford before the design is finalised.