Solar panels for warehouses in Neath
Most of the industrial stock around Neath carries a large, shallow-pitched roof that was never asked to do anything. The survey measures the roof, not the postcode: cladding profile, purlin centres, remaining sheet life and the load the frame can take.
881 kWh per kWp a year at this latitude, so a 500 kWp array models at about 441,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in NeathIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Distribution centre solar across Swansea
What a roof in Neath actually generates
Modelled irradiation at this latitude is 1127 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 881 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.
We survey across the SA postcode area, starting from SA10.
Neath Port Talbot is the planning authority for most sites here, and the built-up area holds a population of about 40,730, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).
Neath ranks 4 of 4 towns we cover in Swansea on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 881 to 921, a spread of 40 kWh per kWp. Within Swansea that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.
Solar already consented near SA10
From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.
| Scheme | Operator | Capacity | Mounting | Status |
|---|---|---|---|---|
| Sun Fields, Gelli Bwch Farm -Solar Array | Hale Construction Limited | 1.3 MW | Ground | Awaiting Construction |
Grid connection through National Grid Electricity Distribution
National Grid Electricity Distribution operates the distribution network across Swansea, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Neath
- What would a 500 kWp array produce in Neath?
- Yes, and the number matters more than the sunshine. At 881 kWh per kWp a year, a 500 kWp array on a Neath roof models at around 441,000 kWh. What changes the answer is how much of that you use on site rather than export. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Which network operator handles the connection in Neath?
- Applications go to National Grid Electricity Distribution, who run the network across Swansea. They decide the export limit, and we handle the G99 paperwork alongside the array design.
- What does Neath Port Talbot require for rooftop solar?
- Roof-mounted panels on a commercial building usually fall under permitted development, subject to the limits on projection above the roof plane and to the building not being listed or in a conservation area. We confirm the position with Neath Port Talbot before the design is finalised.