Solar panels for warehouses in Cwmbrân

What makes a Cwmbrân scheme work is rarely the panels. It is the condition of the roof underneath them. The survey measures the roof, not the postcode: cladding profile, purlin centres, remaining sheet life and the load the frame can take.

903 kWh per kWp a year at this latitude, so a 500 kWp array models at about 452,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Cwmbrân
96 m phase 1
Drawing Cwmbrân unit
Roof 96 x 62 m
Array 500 kWp
Yield 452,000 kWh/yr
Scale 1:500 / Rev A / NP44

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Cwmbrân / Newport
South Wales valley industrial estate with solar arrays on several unit roofs
Industrial stock of the kind we survey across Wales.

Logistics solar PV across Newport

What a roof in Cwmbrân actually generates

Modelled irradiation at this latitude is 1159 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 903 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.

Surveys run across NP postcodes, NP44 outward.

Torfaen is the planning authority for most sites here, and the built-up area holds a population of about 47,090, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Cwmbrân roof makes, month by month

What a Cwmbrân roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 24 kWh per kWpJanFeb: 39 kWh per kWpFebMar: 73 kWh per kWpMarApr: 105 kWh per kWpAprMay: 124 kWh per kWpMayJun: 126 kWh per kWpJun126 kWh Jul: 126 kWh per kWpJulAug: 105 kWh per kWpAugSep: 83 kWh per kWpSepOct: 50 kWh per kWpOctNov: 29 kWh per kWpNovDec: 21 kWh per kWpDec

Jun produces 6.0 times what Dec does on the same roof. A 500 kWp array here models at about 452,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2412,000
Feb3919,500
Mar7336,500
Apr10552,500
May12462,000
Jun12663,000
Jul12663,000
Aug10552,500
Sep8341,500
Oct5025,000
Nov2914,500
Dec2110,500
Source: EU PVGIS v5.2
FIG. 2 Cwmbrân against the rest of Newport
  • Maindee910
  • Caerleon905
  • Cwmbrân903
  • Pontypool887

Cwmbrân ranks 3 of 4 towns we cover in Newport on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 887 to 910, a spread of 23 kWh per kWp. Within Newport that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near NP44

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Cwrt Henllys Farm Lightsource Renewable Energy 5 MW Ground Operational
Ty Coch Hollybush Way Torfaen CBC 3 MW Ground Awaiting Construction
EFG Food And Technology Park Eurofoods UK 0.5 MW Roof Awaiting Construction
Pentre Bach Solar Farm Elgin Energy EsCo Ltd 20 MW Ground Application Submitted
The Grange University Hospital, Caerleon Road - Solar Car Ports Vital Energi Utilities Ltd 0.72 MW Ground Awaiting Construction
Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Cwmbrân

Is there enough sun in Cwmbrân to make this work?
Modelled at 903 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 452,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once walkways and setbacks are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Do we need planning permission in Torfaen?
In most cases no, because roof-mounted panels on commercial buildings sit within permitted development. The exceptions are listed buildings, conservation areas and arrays that stand proud of the roof plane. We check with Torfaen first either way.
Has anyone near NP44 already done this?
The planning database records 5 solar schemes in this postcode district, 1 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.