What makes a Stoke-on-Trent scheme work is rarely the panels. It is the condition of the roof underneath them. The survey measures the roof, not the postcode: cladding profile, purlin centres, remaining sheet life and the load the frame can take.

833 kWh per kWp a year at this latitude, so a 500 kWp array models at about 417,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Stoke-on-Trent
96 m phase 1
Drawing Stoke-on-Trent unit
Roof 96 x 62 m
Array 500 kWp
Yield 417,000 kWh/yr
Scale 1:500 / Rev A / ST3

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Stoke-on-Trent / Staffordshire
Midlands logistics park beside a motorway junction, several roofs carrying arrays
Industrial stock of the kind we survey across West Midlands.

Logistics solar PV across Staffordshire

What a roof in Stoke-on-Trent actually generates

Modelled irradiation at this latitude is 1066 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 833 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 6 percent below the mean across the towns we cover, so the case here leans harder on how much you use on site rather than on raw generation.

Distribution stock around Stoke-on-Trent clusters on M6 J15, M6 J16 and A50, which is where the large single-let roofs are.

Surveys run across ST postcodes, ST3 outward.

Stoke-on-Trent is the planning authority for most sites here, and the built-up area holds a population of about 260,560, which is large enough to pull in the regional distribution centres that come with the biggest roofs (ONS Census 2021 built-up areas).

FIG. 1 What a Stoke-on-Trent roof makes, month by month

What a Stoke-on-Trent roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

0255075100Jan: 20 kWh per kWpJanFeb: 35 kWh per kWpFebMar: 67 kWh per kWpMarApr: 99 kWh per kWpAprMay: 116 kWh per kWpMayJun: 116 kWh per kWpJunJul: 117 kWh per kWpJul117 kWh Aug: 99 kWh per kWpAugSep: 77 kWh per kWpSepOct: 45 kWh per kWpOctNov: 26 kWh per kWpNovDec: 18 kWh per kWpDec

Jul produces 6.5 times what Dec does on the same roof. A 500 kWp array here models at about 417,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2010,000
Feb3517,500
Mar6733,500
Apr9949,500
May11658,000
Jun11658,000
Jul11758,500
Aug9949,500
Sep7738,500
Oct4522,500
Nov2613,000
Dec189,000
Source: EU PVGIS v5.2
FIG. 2 Stoke-on-Trent against the rest of Staffordshire
  • Tamworth857
  • Lichfield857
  • Burton upon Trent852
  • Stafford842
  • Cannock842
  • Stoke-on-Trent833
  • Newcastle-under-Lyme826

Stoke-on-Trent ranks 6 of 7 towns we cover in Staffordshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 826 to 857, a spread of 31 kWh per kWp. Within Staffordshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near ST3

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Mossfield Road - Solar PV Generation System F. Klucznik & Son Limited T/A IAE 0.37 MW Roof Awaiting Construction
Unit 2, G-park, Whittle Road - Solar Panels Private Developer 0.84 MW Roof Awaiting Construction
VWS, Meir - Solar Panels VWS (UK) Limited 0.37 MW Roof Awaiting Construction
Ormiston Meridian Academy, Sandon Road - Solar Panels EEnergy Group plc 0.16 MW Roof Application Submitted

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Staffordshire the planning database records 118 solar schemes totalling 1054 MW, of which 17 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Stoke-on-Trent

How much does a warehouse roof in Stoke-on-Trent generate?
The model gives 833 kWh for every kWp installed here, so 500 kWp comes out at about 417,000 kWh a year before any shading losses. You need roughly 1,485 sqm of clear roof to fit it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Does the grid around Stoke-on-Trent have capacity?
National Grid Electricity Distribution is the distribution network operator for Staffordshire. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. We submit it as part of the design.
Is planning permission needed for panels on a Stoke-on-Trent unit?
Usually permitted development covers it. We still put the question to Stoke-on-Trent before design sign-off, and we tell you early if a full application is needed rather than discovering it late.
Has anyone near ST3 already done this?
The planning database records 4 solar schemes in this postcode district, 4 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.