warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Solar panels for warehouses in Weston-super-Mare

What makes a Weston-super-Mare scheme work is rarely the panels. It is the condition of the roof underneath them. The survey measures the roof, not the postcode: cladding profile, purlin centres, remaining sheet life and the load the frame can take.

934 kWh per kWp a year at this latitude, so a 500 kWp array models at about 467,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Weston-super-Mare
96 m phase 1
Drawing Weston-super-Mare unit
Roof 96 x 62 m
Array 500 kWp
Yield 467,000 kWh/yr
Scale 1:500 / Rev A / BS23

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Weston-super-Mare / Somerset
South West industrial estate on the edge of a market town, with rooftop solar
Industrial stock of the kind we survey across South West.

Logistics solar PV across Somerset

What a roof in Weston-super-Mare actually generates

Modelled irradiation at this latitude is 1196 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 934 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 5 percent above the mean across the towns we cover, which is as good as UK rooftop gets outside the south coast.

Distribution stock around Weston-super-Mare clusters on M5 J21, A370 and A371, which is where the large single-let roofs are.

Surveys run across BS postcodes, BS23 outward.

North Somerset is the planning authority for most sites here, and the built-up area holds a population of about 84,605, the size that tends to be served by mid-box last-mile units rather than national hubs (ONS Census 2021 built-up areas).

FIG. 1 What a Weston-super-Mare roof makes, month by month

What a Weston-super-Mare roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 25 kWh per kWpJanFeb: 42 kWh per kWpFebMar: 77 kWh per kWpMarApr: 111 kWh per kWpAprMay: 128 kWh per kWpMayJun: 127 kWh per kWpJunJul: 129 kWh per kWpJul129 kWh Aug: 107 kWh per kWpAugSep: 84 kWh per kWpSepOct: 52 kWh per kWpOctNov: 30 kWh per kWpNovDec: 21 kWh per kWpDec

Jul produces 6.1 times what Dec does on the same roof. A 500 kWp array here models at about 467,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2512,500
Feb4221,000
Mar7738,500
Apr11155,500
May12864,000
Jun12763,500
Jul12964,500
Aug10753,500
Sep8442,000
Oct5226,000
Nov3015,000
Dec2110,500
Source: EU PVGIS v5.2
FIG. 2 Weston-super-Mare against the rest of Somerset
  • Weston-super-Mare934
  • Bridgwater931
  • Yeovil923
  • Glastonbury913
  • Taunton911
  • Bath904
  • Wells899
  • Frome894

Weston-super-Mare ranks 1 of 8 towns we cover in Somerset on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 894 to 934, a spread of 40 kWh per kWp. Within Somerset that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near BS23

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Weston General Hospital - Photovoltaic Installation Project Weston NHS Foundation Trust n/a Roof Application Submitted
Weston College - Solar Panels Weston College 0.3 MW Roof Awaiting Construction
Weston College University Campus, Loxton Road - Air Source Heat Pumps Weston College 0.42 MW Roof Awaiting Construction
Bournville Primary School, Selworthy Road - Solar Panels Solar Options for Schools Limited 0.32 MW Roof Awaiting Construction

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Somerset the planning database records 223 solar schemes totalling 1574 MW, of which 79 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Weston-super-Mare

How much does a warehouse roof in Weston-super-Mare generate?
The model gives 934 kWh for every kWp installed here, so 500 kWp comes out at about 467,000 kWh a year before any shading losses. You need roughly 1,485 sqm of clear roof to fit it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Does the grid around Weston-super-Mare have capacity?
National Grid Electricity Distribution is the distribution network operator for Somerset. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. We submit it as part of the design.
Is planning permission needed for panels on a Weston-super-Mare unit?
Usually permitted development covers it. We still put the question to North Somerset before design sign-off, and we tell you early if a full application is needed rather than discovering it late.
Has anyone near BS23 already done this?
The planning database records 4 solar schemes in this postcode district, 4 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Somerset locations