warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Solar panels for warehouses in Wigan

The economics of a Wigan rooftop array turn on how much of the generation the occupier uses on site. Each survey records the cladding profile, the usable area once rooflights and plant are removed, and the export limit worth applying for.

828 kWh per kWp a year at this latitude, so a 500 kWp array models at about 414,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Wigan
96 m phase 1
Drawing Wigan unit
Roof 96 x 62 m
Array 500 kWp
Yield 414,000 kWh/yr
Scale 1:500 / Rev A / WN6

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Wigan / Greater Manchester
Industrial estate in the North West with solar arrays on several unit roofs
Industrial stock of the kind we survey across North West.

Warehouse rooftop solar across Greater Manchester

What a roof in Wigan actually generates

Modelled irradiation at this latitude is 1058 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 828 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 7 percent below the mean across the towns we cover, so the case here leans harder on how much you use on site rather than on raw generation.

Distribution stock around Wigan clusters on M6 J25, M6 J27 and M58 J5, which is where the large single-let roofs are.

Most of the units we look at here sit in the WN postcode area.

Wigan is the planning authority for most sites here, and the built-up area holds a population of about 81,580, the size that tends to be served by mid-box last-mile units rather than national hubs (ONS Census 2021 built-up areas).

FIG. 1 What a Wigan roof makes, month by month

What a Wigan roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

0255075100Jan: 19 kWh per kWpJanFeb: 36 kWh per kWpFebMar: 68 kWh per kWpMarApr: 99 kWh per kWpAprMay: 119 kWh per kWpMay119 kWh Jun: 115 kWh per kWpJunJul: 115 kWh per kWpJulAug: 98 kWh per kWpAugSep: 74 kWh per kWpSepOct: 44 kWh per kWpOctNov: 25 kWh per kWpNovDec: 16 kWh per kWpDec

May produces 7.4 times what Dec does on the same roof. A 500 kWp array here models at about 414,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan199,500
Feb3618,000
Mar6834,000
Apr9949,500
May11959,500
Jun11557,500
Jul11557,500
Aug9849,000
Sep7437,000
Oct4422,000
Nov2512,500
Dec168,000
Source: EU PVGIS v5.2
FIG. 2 Wigan against the rest of Greater Manchester
  • Wigan828
  • Altrincham816
  • Bolton801
  • Salford794
  • Manchester788
  • Bury788
  • Stockport785
  • Rochdale771
  • Oldham771

Wigan ranks 1 of 10 towns we cover in Greater Manchester on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 769 to 828, a spread of 59 kWh per kWp. On a 500 kWp array that is about 29,500 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near WN6

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Thompson House Equestrian farm Emotion Solar One 5 MW Ground Operational
Bradley Hall Trading Estate, Bradley Lane - Solar Panels Industrials Propco 1 0.42 MW Roof Awaiting Construction
Wrightington Hospital, Hall Lane - Solar Panels Dalkia Facilities 0.15 MW Roof Awaiting Construction

Grid connection through Electricity North West

Electricity North West is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Greater Manchester the planning database records 118 solar schemes totalling 110 MW, of which 11 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Wigan

What would a 500 kWp array produce in Wigan?
Yes, and the number matters more than the sunshine. At 828 kWh per kWp a year, a 500 kWp array on a Wigan roof models at around 414,000 kWh. What changes the answer is how much of that you use on site rather than export. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection in Wigan?
Applications go to Electricity North West, who run the network across Greater Manchester. They decide the export limit, and we handle the G99 paperwork alongside the array design.
What does Wigan require for rooftop solar?
Roof-mounted panels on a commercial building usually fall under permitted development, subject to the limits on projection above the roof plane and to the building not being listed or in a conservation area. We confirm the position with Wigan before the design is finalised.
Has anyone near WN6 already done this?
The planning database records 3 solar schemes in this postcode district, 2 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Greater Manchester locations