Solar panels for warehouses in Manchester

The economics of a Manchester rooftop array turn on how much of the generation the occupier uses on site. The survey measures the roof, not the postcode: cladding profile, purlin centres, remaining sheet life and the load the frame can take.

788 kWh per kWp a year at this latitude, so a 500 kWp array models at about 394,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Manchester
96 m phase 1
Drawing Manchester unit
Roof 96 x 62 m
Array 500 kWp
Yield 394,000 kWh/yr
Scale 1:500 / Rev A / M12

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Manchester / Greater Manchester
Industrial estate in the North West with solar arrays on several unit roofs
Industrial stock of the kind we survey across North West.

Warehouse rooftop solar across Greater Manchester

What a roof in Manchester actually generates

Modelled irradiation at this latitude is 1010 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 788 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 11 percent below the mean across the towns we cover, so the case here leans harder on how much you use on site rather than on raw generation.

Distribution stock around Manchester clusters on M60, M62 J11 and M56, which is where the large single-let roofs are.

Most of the units we look at here sit in the M postcode area.

Manchester is the planning authority for most sites here, and the built-up area holds a population of about 470,405, which is large enough to pull in the regional distribution centres that come with the biggest roofs (ONS Census 2021 built-up areas).

FIG. 1 What a Manchester roof makes, month by month

What a Manchester roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

0255075100Jan: 17 kWh per kWpJanFeb: 33 kWh per kWpFebMar: 66 kWh per kWpMarApr: 95 kWh per kWpAprMay: 112 kWh per kWpMay112 kWh Jun: 110 kWh per kWpJunJul: 108 kWh per kWpJulAug: 92 kWh per kWpAugSep: 71 kWh per kWpSepOct: 43 kWh per kWpOctNov: 25 kWh per kWpNovDec: 16 kWh per kWpDec

May produces 7.0 times what Dec does on the same roof. A 500 kWp array here models at about 394,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan178,500
Feb3316,500
Mar6633,000
Apr9547,500
May11256,000
Jun11055,000
Jul10854,000
Aug9246,000
Sep7135,500
Oct4321,500
Nov2512,500
Dec168,000
Source: EU PVGIS v5.2
FIG. 2 Manchester against the rest of Greater Manchester
  • Wigan828
  • Altrincham816
  • Bolton801
  • Salford794
  • Manchester788
  • Bury788
  • Stockport785
  • Rochdale771
  • Oldham771

Manchester ranks 5 of 10 towns we cover in Greater Manchester on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 769 to 828, a spread of 59 kWh per kWp. On a 500 kWp array that is about 29,500 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near M12

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Outer Space Studios Solar Panels Ameresco Limited 0.6 MW Roof Operational
Co Op Academy Belle Vue, Hyde Road - Solar Panels Co-op Academy Trust 0.16 MW Roof Application Submitted

Grid connection through Electricity North West

Electricity North West is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Greater Manchester the planning database records 118 solar schemes totalling 110 MW, of which 11 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Manchester

How much does a warehouse roof in Manchester generate?
The model gives 788 kWh for every kWp installed here, so 500 kWp comes out at about 394,000 kWh a year before any shading losses. You need roughly 1,485 sqm of clear roof to fit it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Does the grid around Manchester have capacity?
Electricity North West is the distribution network operator for Greater Manchester. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. We submit it as part of the design.
Is planning permission needed for panels on a Manchester unit?
Usually permitted development covers it. We still put the question to Manchester before design sign-off, and we tell you early if a full application is needed rather than discovering it late.
Has anyone near M12 already done this?
The planning database records 2 solar schemes in this postcode district, 2 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.