Solar panels for warehouses in Bury
Most of the industrial stock around Bury carries a large, shallow-pitched roof that was never asked to do anything. Each survey records the cladding profile, the usable area once rooflights and plant are removed, and the export limit worth applying for.
788 kWh per kWp a year at this latitude, so a 500 kWp array models at about 394,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in BuryIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Distribution centre solar across Greater Manchester
What a roof in Bury actually generates
Modelled irradiation at this latitude is 1009 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 788 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 11 percent below the mean across the towns we cover, so the case here leans harder on how much you use on site rather than on raw generation.
Distribution stock around Bury clusters on M66 J2, M66 J3 and A56, which is where the large single-let roofs are.
We survey across the BL postcode area, starting from BL9.
Bury is the planning authority for most sites here, and the built-up area holds a population of about 81,095, the size that tends to be served by mid-box last-mile units rather than national hubs (ONS Census 2021 built-up areas).
Bury ranks 6 of 10 towns we cover in Greater Manchester on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 769 to 828, a spread of 59 kWh per kWp. On a 500 kWp array that is about 29,500 kWh a year between the strongest and weakest town in the county.
Solar already consented near BL9
From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.
| Scheme | Operator | Capacity | Mounting | Status |
|---|---|---|---|---|
| The Food Warehouse Iceland, Pilsworth Road -Solar Panels | Ashcroft Electrical Services Limited | 0.16 MW | Roof | Awaiting Construction |
Grid connection through Electricity North West
Connections around Bury are handled by Electricity North West, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a warehouse uses most of what the roof makes during the working day.
Across Greater Manchester the planning database records 118 solar schemes totalling 110 MW, of which 11 are operational (REPD Q1 2026).
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Bury
- How much does a warehouse roof in Bury generate?
- The model gives 788 kWh for every kWp installed here, so 500 kWp comes out at about 394,000 kWh a year before any shading losses. You need roughly 1,485 sqm of clear roof to fit it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Does the grid around Bury have capacity?
- Electricity North West is the distribution network operator for Greater Manchester. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. We submit it as part of the design.
- Is planning permission needed for panels on a Bury unit?
- Usually permitted development covers it. We still put the question to Bury before design sign-off, and we tell you early if a full application is needed rather than discovering it late.