Solar panels for warehouses in Tewkesbury

Roof space is the one asset a Tewkesbury unit already owns and rarely uses. What decides a scheme here is the state of the covering and the load path, which is why the survey starts on the roof rather than in a spreadsheet.

878 kWh per kWp a year at this latitude, so a 500 kWp array models at about 439,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Tewkesbury
96 m phase 1
Drawing Tewkesbury unit
Roof 96 x 62 m
Array 500 kWp
Yield 439,000 kWh/yr
Scale 1:500 / Rev A / GL20

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Tewkesbury / Gloucestershire
South West industrial estate on the edge of a market town, with rooftop solar
Industrial stock of the kind we survey across South West.

Warehouse rooftop solar across Gloucestershire

What a roof in Tewkesbury actually generates

Modelled irradiation at this latitude is 1125 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 878 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.

Distribution stock around Tewkesbury clusters on M5 J9, M50 J1 and A38, which is where the large single-let roofs are.

Most of the units we look at here sit in the GL postcode area.

Tewkesbury is the planning authority for most sites here, and the built-up area holds a population of about 14,390, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Tewkesbury roof makes, month by month

What a Tewkesbury roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 24 kWh per kWpJanFeb: 39 kWh per kWpFebMar: 71 kWh per kWpMarApr: 103 kWh per kWpAprMay: 119 kWh per kWpMayJun: 121 kWh per kWpJunJul: 122 kWh per kWpJul122 kWh Aug: 102 kWh per kWpAugSep: 80 kWh per kWpSepOct: 49 kWh per kWpOctNov: 29 kWh per kWpNovDec: 20 kWh per kWpDec

Jul produces 6.1 times what Dec does on the same roof. A 500 kWp array here models at about 439,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2412,000
Feb3919,500
Mar7135,500
Apr10351,500
May11959,500
Jun12160,500
Jul12261,000
Aug10251,000
Sep8040,000
Oct4924,500
Nov2914,500
Dec2010,000
Source: EU PVGIS v5.2
FIG. 2 Tewkesbury against the rest of Gloucestershire
  • Lydney905
  • Cirencester892
  • Stroud887
  • Cheltenham879
  • Tewkesbury878
  • Gloucester870

Tewkesbury ranks 5 of 6 towns we cover in Gloucestershire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 870 to 905, a spread of 35 kWh per kWp. Within Gloucestershire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution operates the distribution network across Gloucestershire, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Gloucestershire the planning database records 207 solar schemes totalling 1592 MW, of which 39 are operational (REPD Q1 2026).

Solar already consented near GL20

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Claydon Farm European Energy Photovoltaics 18.2 MW Ground Abandoned
Walton Cardiff Manor Active Renewables 2 MW Ground Application Refused
Moog Controls Factory Moog Controls 0.38 MW Roof Operational
Claydon Farm - Solar Farm & Battery Storage JBM Solar Projects 17 Limited 49.9 MW Ground Awaiting Construction
Gloucester Road - Solar Carport Array Tewkesbury Borough Council 0.22 MW Ground Awaiting Construction
Dairy Way, Northway Lane, Unit 22 - Solar Panels Cotteswold Dairy Limited 0.59 MW Roof Application Submitted
Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Tewkesbury

What would a 500 kWp array produce in Tewkesbury?
Yes, and the number matters more than the sunshine. At 878 kWh per kWp a year, a 500 kWp array on a Tewkesbury roof models at around 439,000 kWh. What changes the answer is how much of that you use on site rather than export. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection in Tewkesbury?
Applications go to National Grid Electricity Distribution, who run the network across Gloucestershire. They decide the export limit, and we handle the G99 paperwork alongside the array design.
What does Tewkesbury require for rooftop solar?
Roof-mounted panels on a commercial building usually fall under permitted development, subject to the limits on projection above the roof plane and to the building not being listed or in a conservation area. We confirm the position with Tewkesbury before the design is finalised.
Has anyone near GL20 already done this?
The planning database records 6 solar schemes in this postcode district, 2 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Gloucestershire locations