Solar panels for warehouses in Newton Abbot

The economics of a Newton Abbot rooftop array turn on how much of the generation the occupier uses on site. Each survey records the cladding profile, the usable area once rooflights and plant are removed, and the export limit worth applying for.

943 kWh per kWp a year at this latitude, so a 500 kWp array models at about 472,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Newton Abbot
96 m phase 1
Drawing Newton Abbot unit
Roof 96 x 62 m
Array 500 kWp
Yield 472,000 kWh/yr
Scale 1:500 / Rev A / TQ12

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Newton Abbot / Devon
South West industrial estate on the edge of a market town, with rooftop solar
Industrial stock of the kind we survey across South West.

Warehouse rooftop solar across Devon

What a roof in Newton Abbot actually generates

Modelled irradiation at this latitude is 1200 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 943 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 6 percent above the mean across the towns we cover, which is as good as UK rooftop gets outside the south coast.

Distribution stock around Newton Abbot clusters on A38, A380 and A381, which is where the large single-let roofs are.

Most of the units we look at here sit in the TQ postcode area.

Teignbridge is the planning authority for most sites here, and the built-up area holds a population of about 29,650, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Newton Abbot roof makes, month by month

What a Newton Abbot roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 24 kWh per kWpJanFeb: 41 kWh per kWpFebMar: 77 kWh per kWpMarApr: 111 kWh per kWpAprMay: 129 kWh per kWpMayJun: 130 kWh per kWpJun130 kWh Jul: 130 kWh per kWpJulAug: 111 kWh per kWpAugSep: 86 kWh per kWpSepOct: 53 kWh per kWpOctNov: 31 kWh per kWpNovDec: 18 kWh per kWpDec

Jun produces 7.2 times what Dec does on the same roof. A 500 kWp array here models at about 472,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2412,000
Feb4120,500
Mar7738,500
Apr11155,500
May12964,500
Jun13065,000
Jul13065,000
Aug11155,500
Sep8643,000
Oct5326,500
Nov3115,500
Dec189,000
Source: EU PVGIS v5.2
FIG. 2 Newton Abbot against the rest of Devon
  • Paignton961
  • Plymouth960
  • Newton Abbot943
  • Exeter938
  • Torquay937
  • Exmouth937
  • Barnstaple908
  • Tiverton903

Newton Abbot ranks 3 of 8 towns we cover in Devon on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 903 to 961, a spread of 58 kWh per kWp. On a 500 kWp array that is about 29,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near TQ12

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Rydon Farm MTS Rydon Solar 12 MW Ground Operational
Court Barton Farm, Coffinswell - Solar Farm Coubar Energy Limited (Windel) 21 MW Ground Awaiting Construction
Brooke House, Sabre Close - Solar Panels Wilton Bradley Limited 0.28 MW Roof Awaiting Construction
East Golds Works, Kingsteignton Road - Solar Panels Sibelco UK East Golds Works 1.06 MW Roof Awaiting Construction
Sibelco UK Preston Manor Works, Kingsteignton - Solar Panels Sibelco UK Preston Manor Works 0.79 MW Roof Awaiting Construction

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution operates the distribution network across Devon, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Devon the planning database records 248 solar schemes totalling 1451 MW, of which 90 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Newton Abbot

What would a 500 kWp array produce in Newton Abbot?
Yes, and the number matters more than the sunshine. At 943 kWh per kWp a year, a 500 kWp array on a Newton Abbot roof models at around 472,000 kWh. What changes the answer is how much of that you use on site rather than export. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection in Newton Abbot?
Applications go to National Grid Electricity Distribution, who run the network across Devon. They decide the export limit, and we handle the G99 paperwork alongside the array design.
What does Teignbridge require for rooftop solar?
Roof-mounted panels on a commercial building usually fall under permitted development, subject to the limits on projection above the roof plane and to the building not being listed or in a conservation area. We confirm the position with Teignbridge before the design is finalised.
Has anyone near TQ12 already done this?
The planning database records 5 solar schemes in this postcode district, 3 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.