warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Solar panels for warehouses in Exmouth

Most of the industrial stock around Exmouth carries a large, shallow-pitched roof that was never asked to do anything. Each survey records the cladding profile, the usable area once rooflights and plant are removed, and the export limit worth applying for.

937 kWh per kWp a year at this latitude, so a 500 kWp array models at about 469,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Exmouth
96 m phase 1
Drawing Exmouth unit
Roof 96 x 62 m
Array 500 kWp
Yield 469,000 kWh/yr
Scale 1:500 / Rev A / EX8

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Exmouth / Devon
South West industrial estate on the edge of a market town, with rooftop solar
Industrial stock of the kind we survey across South West.

Distribution centre solar across Devon

What a roof in Exmouth actually generates

Modelled irradiation at this latitude is 1200 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 937 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 6 percent above the mean across the towns we cover, which is as good as UK rooftop gets outside the south coast.

We survey across the EX postcode area, starting from EX8.

East Devon is the planning authority for most sites here, and the built-up area holds a population of about 35,500, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Exmouth roof makes, month by month

What a Exmouth roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 25 kWh per kWpJanFeb: 41 kWh per kWpFebMar: 76 kWh per kWpMarApr: 110 kWh per kWpAprMay: 127 kWh per kWpMayJun: 129 kWh per kWpJun129 kWh Jul: 129 kWh per kWpJulAug: 110 kWh per kWpAugSep: 85 kWh per kWpSepOct: 52 kWh per kWpOctNov: 31 kWh per kWpNovDec: 22 kWh per kWpDec

Jun produces 5.9 times what Dec does on the same roof. A 500 kWp array here models at about 469,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2512,500
Feb4120,500
Mar7638,000
Apr11055,000
May12763,500
Jun12964,500
Jul12964,500
Aug11055,000
Sep8542,500
Oct5226,000
Nov3115,500
Dec2211,000
Source: EU PVGIS v5.2
FIG. 2 Exmouth against the rest of Devon
  • Paignton961
  • Plymouth960
  • Newton Abbot943
  • Exeter938
  • Torquay937
  • Exmouth937
  • Barnstaple908
  • Tiverton903

Exmouth ranks 6 of 8 towns we cover in Devon on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 903 to 961, a spread of 58 kWh per kWp. On a 500 kWp array that is about 29,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near EX8

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Liverton Farm Clinton Devon Estates 4.8 MW Ground Operational
Bystock Solar Farm Lightsource Renewable Energy 4.1 MW Ground Operational
Coombe Farm Renewable Energy Systems Ltd (RES) 8 MW Ground Operational
Veiges Farm Solar Park Inazin (Veiges Farm Solar Park Ltd) 5 MW Ground Abandoned
Devon Cliffs Holiday Centre, Sandy Bay - Solar panels Bourne Leisure Group 0.51 MW Roof Awaiting Construction

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Devon the planning database records 248 solar schemes totalling 1451 MW, of which 90 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Exmouth

Is there enough sun in Exmouth to make this work?
Modelled at 937 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 469,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once walkways and setbacks are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Who do we apply to for export in Exmouth?
Capacity varies street by street, and only National Grid Electricity Distribution can answer it for your connection. We ask the question early, because an export-limited offer changes the design rather than killing the scheme.
Do we need planning permission in East Devon?
In most cases no, because roof-mounted panels on commercial buildings sit within permitted development. The exceptions are listed buildings, conservation areas and arrays that stand proud of the roof plane. We check with East Devon first either way.
Has anyone near EX8 already done this?
The planning database records 5 solar schemes in this postcode district, 1 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Devon locations