warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Solar panels for warehouses in Whitehaven

Sheds around Whitehaven tend to have more roof than the business has any other use for. We start with the covering and the structure, because a roof with five years left in it changes the answer entirely.

855 kWh per kWp a year at this latitude, so a 500 kWp array models at about 428,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Whitehaven
96 m phase 1
Drawing Whitehaven unit
Roof 96 x 62 m
Array 500 kWp
Yield 428,000 kWh/yr
Scale 1:500 / Rev A / CA28

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Whitehaven / Cumbria
Industrial estate in the North West with solar arrays on several unit roofs
Industrial stock of the kind we survey across North West.

Distribution centre solar across Cumbria

What a roof in Whitehaven actually generates

Modelled irradiation at this latitude is 1084 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 855 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 3 percent below the mean across the towns we cover, so the case here leans harder on how much you use on site rather than on raw generation.

We survey across the CA postcode area, starting from CA28.

Copeland is the planning authority for most sites here, and the built-up area holds a population of about 22,945, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Whitehaven roof makes, month by month

What a Whitehaven roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 17 kWh per kWpJanFeb: 34 kWh per kWpFebMar: 68 kWh per kWpMarApr: 106 kWh per kWpAprMay: 129 kWh per kWpMay129 kWh Jun: 126 kWh per kWpJunJul: 121 kWh per kWpJulAug: 103 kWh per kWpAugSep: 74 kWh per kWpSepOct: 42 kWh per kWpOctNov: 21 kWh per kWpNovDec: 13 kWh per kWpDec

May produces 9.9 times what Dec does on the same roof. A 500 kWp array here models at about 428,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan178,500
Feb3417,000
Mar6834,000
Apr10653,000
May12964,500
Jun12663,000
Jul12160,500
Aug10351,500
Sep7437,000
Oct4221,000
Nov2110,500
Dec136,500
Source: EU PVGIS v5.2
FIG. 2 Whitehaven against the rest of Cumbria
  • Barrow-in-Furness893
  • Whitehaven855
  • Workington835
  • Carlisle806
  • Penrith794
  • Kendal793

Whitehaven ranks 2 of 6 towns we cover in Cumbria on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 793 to 893, a spread of 100 kWh per kWp. On a 500 kWp array that is about 50,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through Electricity North West

Electricity North West is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Cumbria the planning database records 86 solar schemes totalling 574 MW, of which 17 are operational (REPD Q1 2026).

Solar already consented near CA28

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
J Dixon And Sons, Lowther Street - Solar Panels J Dixon and Son Limited 0.18 MW Roof Awaiting Construction
Whitehaven Academy - Solar Panels The Whitehaven Academy 0.21 MW Roof Awaiting Construction
Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Whitehaven

How much does a warehouse roof in Whitehaven generate?
The model gives 855 kWh for every kWp installed here, so 500 kWp comes out at about 428,000 kWh a year before any shading losses. You need roughly 1,485 sqm of clear roof to fit it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Does the grid around Whitehaven have capacity?
Electricity North West is the distribution network operator for Cumbria. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. We submit it as part of the design.
Is planning permission needed for panels on a Whitehaven unit?
Usually permitted development covers it. We still put the question to Copeland before design sign-off, and we tell you early if a full application is needed rather than discovering it late.
Has anyone near CA28 already done this?
The planning database records 2 solar schemes in this postcode district, 2 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Cumbria locations