Most of the industrial stock around Northwich carries a large, shallow-pitched roof that was never asked to do anything. Each survey records the cladding profile, the usable area once rooflights and plant are removed, and the export limit worth applying for.

832 kWh per kWp a year at this latitude, so a 500 kWp array models at about 416,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Northwich
96 m phase 1
Drawing Northwich unit
Roof 96 x 62 m
Array 500 kWp
Yield 416,000 kWh/yr
Scale 1:500 / Rev A / CW8

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Northwich / Cheshire
Industrial estate in the North West with solar arrays on several unit roofs
Industrial stock of the kind we survey across North West.

Distribution centre solar across Cheshire

What a roof in Northwich actually generates

Modelled irradiation at this latitude is 1067 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 832 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 6 percent below the mean across the towns we cover, so the case here leans harder on how much you use on site rather than on raw generation.

We survey across the CW postcode area, starting from CW8.

Cheshire West and Chester is the planning authority for most sites here, and the built-up area holds a population of about 18,640, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Northwich roof makes, month by month

What a Northwich roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

0255075100Jan: 19 kWh per kWpJanFeb: 36 kWh per kWpFebMar: 69 kWh per kWpMarApr: 99 kWh per kWpAprMay: 118 kWh per kWpMay118 kWh Jun: 115 kWh per kWpJunJul: 114 kWh per kWpJulAug: 99 kWh per kWpAugSep: 75 kWh per kWpSepOct: 46 kWh per kWpOctNov: 25 kWh per kWpNovDec: 17 kWh per kWpDec

May produces 6.9 times what Dec does on the same roof. A 500 kWp array here models at about 416,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan199,500
Feb3618,000
Mar6934,500
Apr9949,500
May11859,000
Jun11557,500
Jul11457,000
Aug9949,500
Sep7537,500
Oct4623,000
Nov2512,500
Dec178,500
Source: EU PVGIS v5.2
FIG. 2 Northwich against the rest of Cheshire
  • Nantwich840
  • Chester836
  • Crewe835
  • Ellesmere Port835
  • Northwich832
  • Warrington828
  • Wilmslow801
  • Macclesfield790

Northwich ranks 5 of 8 towns we cover in Cheshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 790 to 840, a spread of 50 kWh per kWp. On a 500 kWp array that is about 25,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near CW8

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Wallerscote Limebeds - Solar Pv Park Infinis Solar Developments Limited / Green Earth Developments 22 MW Ground Awaiting Construction

Grid connection through SP Energy Networks / Electricity North West

SP Energy Networks / Electricity North West operates the distribution network across Cheshire, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Cheshire the planning database records 157 solar schemes totalling 582 MW, of which 13 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Northwich

How much does a warehouse roof in Northwich generate?
The model gives 832 kWh for every kWp installed here, so 500 kWp comes out at about 416,000 kWh a year before any shading losses. You need roughly 1,485 sqm of clear roof to fit it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Does the grid around Northwich have capacity?
SP Energy Networks / Electricity North West is the distribution network operator for Cheshire. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. We submit it as part of the design.
Is planning permission needed for panels on a Northwich unit?
Usually permitted development covers it. We still put the question to Cheshire West and Chester before design sign-off, and we tell you early if a full application is needed rather than discovering it late.