Solar panels for warehouses in Nantwich

Most of the industrial stock around Nantwich carries a large, shallow-pitched roof that was never asked to do anything. The survey measures the roof, not the postcode: cladding profile, purlin centres, remaining sheet life and the load the frame can take.

840 kWh per kWp a year at this latitude, so a 500 kWp array models at about 420,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Nantwich
96 m phase 1
Drawing Nantwich unit
Roof 96 x 62 m
Array 500 kWp
Yield 420,000 kWh/yr
Scale 1:500 / Rev A / CW5

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Nantwich / Cheshire
Industrial estate in the North West with solar arrays on several unit roofs
Industrial stock of the kind we survey across North West.

Distribution centre solar across Cheshire

What a roof in Nantwich actually generates

Modelled irradiation at this latitude is 1077 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 840 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 5 percent below the mean across the towns we cover, so the case here leans harder on how much you use on site rather than on raw generation.

We survey across the CW postcode area, starting from CW5.

Cheshire East is the planning authority for most sites here, and the built-up area holds a population of about 18,740, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Nantwich roof makes, month by month

What a Nantwich roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

0255075100Jan: 20 kWh per kWpJanFeb: 36 kWh per kWpFebMar: 69 kWh per kWpMarApr: 100 kWh per kWpAprMay: 117 kWh per kWpMay117 kWh Jun: 117 kWh per kWpJunJul: 116 kWh per kWpJulAug: 99 kWh per kWpAugSep: 76 kWh per kWpSepOct: 46 kWh per kWpOctNov: 26 kWh per kWpNovDec: 18 kWh per kWpDec

May produces 6.5 times what Dec does on the same roof. A 500 kWp array here models at about 420,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2010,000
Feb3618,000
Mar6934,500
Apr10050,000
May11758,500
Jun11758,500
Jul11658,000
Aug9949,500
Sep7638,000
Oct4623,000
Nov2613,000
Dec189,000
Source: EU PVGIS v5.2
FIG. 2 Nantwich against the rest of Cheshire
  • Nantwich840
  • Chester836
  • Crewe835
  • Ellesmere Port835
  • Northwich832
  • Warrington828
  • Wilmslow801
  • Macclesfield790

Nantwich ranks 1 of 8 towns we cover in Cheshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 790 to 840, a spread of 50 kWh per kWp. On a 500 kWp array that is about 25,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near CW5

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Hatherton Lodge Green Switch Solutions - Liquidated 8.3 MW Ground Planning Permission Expired
Land To The North Of Dairy House Farm Lightsource Renewable Energy 3.4 MW Ground Operational
Royals Wood Farm INRG Solar 5 MW Ground Abandoned
Bridgemere Garden Centre,London Road - Solar Panels Blue Diamond Limited 0.67 MW Roof Awaiting Construction
Hatherton Lodge Farm, Hunsterson Road - Solar Farm Noventum Power Limited 12.5 MW Ground Awaiting Construction
Smeaton Wood Farm, Pinsley Green Road - Solar Panels Smeaton Wood Farm Limited 0.18 MW Roof Awaiting Construction

Grid connection through SP Energy Networks / Electricity North West

SP Energy Networks / Electricity North West is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Cheshire the planning database records 157 solar schemes totalling 582 MW, of which 13 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Nantwich

How much does a warehouse roof in Nantwich generate?
The model gives 840 kWh for every kWp installed here, so 500 kWp comes out at about 420,000 kWh a year before any shading losses. You need roughly 1,485 sqm of clear roof to fit it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Does the grid around Nantwich have capacity?
SP Energy Networks / Electricity North West is the distribution network operator for Cheshire. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. We submit it as part of the design.
Is planning permission needed for panels on a Nantwich unit?
Usually permitted development covers it. We still put the question to Cheshire East before design sign-off, and we tell you early if a full application is needed rather than discovering it late.
Has anyone near CW5 already done this?
The planning database records 6 solar schemes in this postcode district, 2 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.