What makes a Macclesfield scheme work is rarely the panels. It is the condition of the roof underneath them. The survey measures the roof, not the postcode: cladding profile, purlin centres, remaining sheet life and the load the frame can take.

790 kWh per kWp a year at this latitude, so a 500 kWp array models at about 395,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Macclesfield
96 m phase 1
Drawing Macclesfield unit
Roof 96 x 62 m
Array 500 kWp
Yield 395,000 kWh/yr
Scale 1:500 / Rev A / SK11

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Macclesfield / Cheshire
Industrial estate in the North West with solar arrays on several unit roofs
Industrial stock of the kind we survey across North West.

Logistics solar PV across Cheshire

What a roof in Macclesfield actually generates

Modelled irradiation at this latitude is 1010 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 790 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 11 percent below the mean across the towns we cover, so the case here leans harder on how much you use on site rather than on raw generation.

Surveys run across SK postcodes, SK11 outward.

Cheshire East is the planning authority for most sites here, and the built-up area holds a population of about 54,345, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Macclesfield roof makes, month by month

What a Macclesfield roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

0255075100Jan: 16 kWh per kWpJanFeb: 33 kWh per kWpFebMar: 65 kWh per kWpMarApr: 96 kWh per kWpAprMay: 112 kWh per kWpMay112 kWh Jun: 112 kWh per kWpJunJul: 110 kWh per kWpJulAug: 93 kWh per kWpAugSep: 71 kWh per kWpSepOct: 42 kWh per kWpOctNov: 24 kWh per kWpNovDec: 15 kWh per kWpDec

May produces 7.5 times what Dec does on the same roof. A 500 kWp array here models at about 395,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan168,000
Feb3316,500
Mar6532,500
Apr9648,000
May11256,000
Jun11256,000
Jul11055,000
Aug9346,500
Sep7135,500
Oct4221,000
Nov2412,000
Dec157,500
Source: EU PVGIS v5.2
FIG. 2 Macclesfield against the rest of Cheshire
  • Nantwich840
  • Chester836
  • Crewe835
  • Ellesmere Port835
  • Northwich832
  • Warrington828
  • Wilmslow801
  • Macclesfield790

Macclesfield ranks 8 of 8 towns we cover in Cheshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 790 to 840, a spread of 50 kWh per kWp. On a 500 kWp array that is about 25,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through SP Energy Networks / Electricity North West

SP Energy Networks / Electricity North West is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Cheshire the planning database records 157 solar schemes totalling 582 MW, of which 13 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Macclesfield

How much does a warehouse roof in Macclesfield generate?
The model gives 790 kWh for every kWp installed here, so 500 kWp comes out at about 395,000 kWh a year before any shading losses. You need roughly 1,485 sqm of clear roof to fit it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Does the grid around Macclesfield have capacity?
SP Energy Networks / Electricity North West is the distribution network operator for Cheshire. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. We submit it as part of the design.
Is planning permission needed for panels on a Macclesfield unit?
Usually permitted development covers it. We still put the question to Cheshire East before design sign-off, and we tell you early if a full application is needed rather than discovering it late.

Nearby