warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Solar panels for warehouses in Huntingdon

The economics of a Huntingdon rooftop array turn on how much of the generation the occupier uses on site. The survey measures the roof, not the postcode: cladding profile, purlin centres, remaining sheet life and the load the frame can take.

908 kWh per kWp a year at this latitude, so a 500 kWp array models at about 454,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Huntingdon
96 m phase 1
Drawing Huntingdon unit
Roof 96 x 62 m
Array 500 kWp
Yield 454,000 kWh/yr
Scale 1:500 / Rev A / PE29

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Huntingdon / Cambridgeshire
Distribution estate in the east of England with solar arrays on several roofs
Industrial stock of the kind we survey across East of England.

Warehouse rooftop solar across Cambridgeshire

What a roof in Huntingdon actually generates

Modelled irradiation at this latitude is 1161 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 908 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.

Distribution stock around Huntingdon clusters on A1(M), A14 and A141, which is where the large single-let roofs are.

Most of the units we look at here sit in the PE postcode area.

Huntingdonshire is the planning authority for most sites here, and the built-up area holds a population of about 25,600, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Huntingdon roof makes, month by month

What a Huntingdon roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 24 kWh per kWpJanFeb: 40 kWh per kWpFebMar: 74 kWh per kWpMarApr: 104 kWh per kWpAprMay: 122 kWh per kWpMayJun: 125 kWh per kWpJun125 kWh Jul: 125 kWh per kWpJulAug: 105 kWh per kWpAugSep: 83 kWh per kWpSepOct: 52 kWh per kWpOctNov: 31 kWh per kWpNovDec: 22 kWh per kWpDec

Jun produces 5.7 times what Dec does on the same roof. A 500 kWp array here models at about 454,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2412,000
Feb4020,000
Mar7437,000
Apr10452,000
May12261,000
Jun12562,500
Jul12562,500
Aug10552,500
Sep8341,500
Oct5226,000
Nov3115,500
Dec2211,000
Source: EU PVGIS v5.2
FIG. 2 Huntingdon against the rest of Cambridgeshire
  • Huntingdon908
  • Cambridge906
  • St Ives906
  • Wisbech905
  • Ely904
  • March900
  • Peterborough898
  • St Neots898

Huntingdon ranks 1 of 8 towns we cover in Cambridgeshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 898 to 908, a spread of 10 kWh per kWp. Within Cambridgeshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near PE29

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Lancaster House, Lancaster Way - Solar Panels Anglian Water Services Limited 0.25 MW Roof Awaiting Construction
Latham Road - Solar Panels Nottinghamshire Country Council 0.88 MW Roof Awaiting Construction
Hilton Food Group, Latham Road - Solar Panels Nottinghamshire County Council Property Design and Maintenance Operations 0.77 MW Roof Awaiting Construction
J Sainsbury Plc, St Germain Walk - Solar Panels Sainsbury's Supermarkets Limited 0.34 MW Roof Application Submitted

Grid connection through UK Power Networks

UK Power Networks is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Cambridgeshire the planning database records 172 solar schemes totalling 2422 MW, of which 46 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Huntingdon

Is there enough sun in Huntingdon to make this work?
Modelled at 908 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 454,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once walkways and setbacks are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Who do we apply to for export in Huntingdon?
Capacity varies street by street, and only UK Power Networks can answer it for your connection. We ask the question early, because an export-limited offer changes the design rather than killing the scheme.
Do we need planning permission in Huntingdonshire?
In most cases no, because roof-mounted panels on commercial buildings sit within permitted development. The exceptions are listed buildings, conservation areas and arrays that stand proud of the roof plane. We check with Huntingdonshire first either way.
Has anyone near PE29 already done this?
The planning database records 4 solar schemes in this postcode district, 4 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Cambridgeshire locations