warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Warehouse solar panels across Cambridgeshire

We survey industrial and distribution roofs throughout Cambridgeshire, model what each one can carry, and arrange the design, the grid application and the install through our MCS-certified partner.

Modelled yield
903 kWh/kWp/yr
Mean across Cambridgeshire towns, EU PVGIS v5.2
Network operator
UK Power Networks
G99 applications and export limits
Solar on record
172 schemes / 2422 MW
REPD Q1 2026, 46 operational
Towns covered
8
Surveys arranged county wide

What the data says about Cambridgeshire

Modelled yield is consistent across Cambridgeshire, from 898 kWh per kWp a year at St Neots to 908 at Huntingdon. At that spread, location is not what decides your payback here. Your consumption pattern is.

The larger roofs in Cambridgeshire follow the freight routes. Across the towns we cover that means A1(M), A1, A47, A605, M11 J11 and M11 J14, which is where single-let distribution stock concentrates.

The government's planning database records 172 solar schemes in Cambridgeshire totalling 2422 MW, of which 46 are already operational and 18 of the schemes in our covered postcode districts are roof mounted. Source: Renewable Energy Planning Database, Q1 2026.

Connections across the county run through UK Power Networks. Anything above 3.68 kW per phase needs a G99 application, and the export limit they offer shapes the design, so we ask the question before the array is sized rather than after.

Towns in Cambridgeshire

Book a survey in Cambridgeshire

Send the postcode and the rough footprint. We come back with what the roof can carry, what it would generate against your consumption, and what the funding routes look like.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

All UK locations