Solar panels for warehouses in Wokingham

Sheds around Wokingham tend to have more roof than the business has any other use for. We start with the covering and the structure, because a roof with five years left in it changes the answer entirely.

898 kWh per kWp a year at this latitude, so a 500 kWp array models at about 449,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Wokingham
96 m phase 1
Drawing Wokingham unit
Roof 96 x 62 m
Array 500 kWp
Yield 449,000 kWh/yr
Scale 1:500 / Rev A / RG40

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Wokingham / Berkshire
Home Counties distribution estate with solar arrays on several unit roofs
Industrial stock of the kind we survey across South East.

Distribution centre solar across Berkshire

What a roof in Wokingham actually generates

Modelled irradiation at this latitude is 1153 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 898 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.

We survey across the RG postcode area, starting from RG40.

Wokingham is the planning authority for most sites here, and the built-up area holds a population of about 50,325, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Wokingham roof makes, month by month

What a Wokingham roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 25 kWh per kWpJanFeb: 38 kWh per kWpFebMar: 72 kWh per kWpMarApr: 104 kWh per kWpAprMay: 120 kWh per kWpMayJun: 125 kWh per kWpJun125 kWh Jul: 124 kWh per kWpJulAug: 105 kWh per kWpAugSep: 82 kWh per kWpSepOct: 51 kWh per kWpOctNov: 30 kWh per kWpNovDec: 22 kWh per kWpDec

Jun produces 5.7 times what Dec does on the same roof. A 500 kWp array here models at about 449,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2512,500
Feb3819,000
Mar7236,000
Apr10452,000
May12060,000
Jun12562,500
Jul12462,000
Aug10552,500
Sep8241,000
Oct5125,500
Nov3015,000
Dec2211,000
Source: EU PVGIS v5.2
FIG. 2 Wokingham against the rest of Berkshire
  • Thatcham910
  • Reading907
  • Maidenhead905
  • Newbury904
  • Slough903
  • Windsor901
  • Wokingham898
  • Bracknell891

Wokingham ranks 7 of 8 towns we cover in Berkshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 891 to 910, a spread of 19 kWh per kWp. Within Berkshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through Scottish and Southern Electricity Networks

Scottish and Southern Electricity Networks is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Berkshire the planning database records 83 solar schemes totalling 317 MW, of which 8 are operational (REPD Q1 2026).

Solar already consented near RG40

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Barkham Farms - Solar Farm Wokingham Borough Council 33 MW Ground Awaiting Construction
Rectory Road - Roof Mounted Solar panels Wokingham Borough Council n/a Roof Awaiting Construction
Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Wokingham

What would a 500 kWp array produce in Wokingham?
Yes, and the number matters more than the sunshine. At 898 kWh per kWp a year, a 500 kWp array on a Wokingham roof models at around 449,000 kWh. What changes the answer is how much of that you use on site rather than export. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection in Wokingham?
Applications go to Scottish and Southern Electricity Networks, who run the network across Berkshire. They decide the export limit, and we handle the G99 paperwork alongside the array design.
What does Wokingham require for rooftop solar?
Roof-mounted panels on a commercial building usually fall under permitted development, subject to the limits on projection above the roof plane and to the building not being listed or in a conservation area. We confirm the position with Wokingham before the design is finalised.
Has anyone near RG40 already done this?
The planning database records 2 solar schemes in this postcode district, 1 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.