Warehouse solar panels across Berkshire
We survey industrial and distribution roofs throughout Berkshire, model what each one can carry, and arrange the design, the grid application and the install through our MCS-certified partner.
- Modelled yield
- 902 kWh/kWp/yr
- Mean across Berkshire towns, EU PVGIS v5.2
- Network operator
- Scottish and Southern Electricity Networks
- G99 applications and export limits
- Solar on record
- 83 schemes / 317 MW
- REPD Q1 2026, 8 operational
- Towns covered
- 8
- Surveys arranged county wide
What the data says about Berkshire
Modelled yield is consistent across Berkshire, from 891 kWh per kWp a year at Bracknell to 910 at Thatcham. At that spread, location is not what decides your payback here. Your consumption pattern is.
The larger roofs in Berkshire follow the freight routes. Across the towns we cover that means M4 J10, M4 J11, M4 J12, A33, M4 J5 and M4 J6, which is where single-let distribution stock concentrates.
The government's planning database records 83 solar schemes in Berkshire totalling 317 MW, of which 8 are already operational and 23 of the schemes in our covered postcode districts are roof mounted. Source: Renewable Energy Planning Database, Q1 2026.
Connections across the county run through Scottish and Southern Electricity Networks. Anything above 3.68 kW per phase needs a G99 application, and the export limit they offer shapes the design, so we ask the question before the array is sized rather than after.
- Reading 907 kWh/kWp
- Slough 903 kWh/kWp
- Bracknell 891 kWh/kWp
- Maidenhead 905 kWh/kWp
- Wokingham 898 kWh/kWp
- Newbury 904 kWh/kWp
- Windsor 901 kWh/kWp
- Thatcham 910 kWh/kWp
Book a survey in Berkshire
Send the postcode and the rough footprint. We come back with what the roof can carry, what it would generate against your consumption, and what the funding routes look like.