warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Solar panels for warehouses in Malvern

Sheds around Malvern tend to have more roof than the business has any other use for. What decides a scheme here is the state of the covering and the load path, which is why the survey starts on the roof rather than in a spreadsheet.

875 kWh per kWp a year at this latitude, so a 500 kWp array models at about 438,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Malvern
96 m phase 1
Drawing Malvern unit
Roof 96 x 62 m
Array 500 kWp
Yield 438,000 kWh/yr
Scale 1:500 / Rev A / Worcestershire

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Malvern / Worcestershire
Aerial view of an industrial estate where some warehouse roofs carry solar arrays and others are bare steel
Industrial stock of the kind we survey across Worcestershire.

Distribution centre solar across Worcestershire

What a roof in Malvern actually generates

Modelled irradiation at this latitude is 1122 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 875 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.

FIG. 1 What a Malvern roof makes, month by month

What a Malvern roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 21 kWh per kWpJanFeb: 38 kWh per kWpFebMar: 73 kWh per kWpMarApr: 102 kWh per kWpAprMay: 121 kWh per kWpMayJun: 121 kWh per kWpJunJul: 123 kWh per kWpJul123 kWh Aug: 104 kWh per kWpAugSep: 81 kWh per kWpSepOct: 49 kWh per kWpOctNov: 26 kWh per kWpNovDec: 16 kWh per kWpDec

Jul produces 7.7 times what Dec does on the same roof. A 500 kWp array here models at about 438,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2110,500
Feb3819,000
Mar7336,500
Apr10251,000
May12160,500
Jun12160,500
Jul12361,500
Aug10452,000
Sep8140,500
Oct4924,500
Nov2613,000
Dec168,000
Source: EU PVGIS v5.2
FIG. 2 Malvern against the rest of Worcestershire
  • Worcester882
  • Redditch877
  • Droitwich877
  • Evesham876
  • Malvern875
  • Bromsgrove872
  • Kidderminster866

Malvern ranks 5 of 7 towns we cover in Worcestershire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 866 to 882, a spread of 16 kWh per kWp. Within Worcestershire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution operates the distribution network across Worcestershire, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Worcestershire the planning database records 62 solar schemes totalling 506 MW, of which 6 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Malvern

How much does a warehouse roof in Malvern generate?
The model gives 875 kWh for every kWp installed here, so 500 kWp comes out at about 438,000 kWh a year before any shading losses. You need roughly 1,485 sqm of clear roof to fit it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Does the grid around Malvern have capacity?
National Grid Electricity Distribution is the distribution network operator for Worcestershire. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. We submit it as part of the design.

Nearby

All Worcestershire locations