Solar panels for warehouses in Bedworth

Sheds around Bedworth tend to have more roof than the business has any other use for. What decides a scheme here is the state of the covering and the load path, which is why the survey starts on the roof rather than in a spreadsheet.

866 kWh per kWp a year at this latitude, so a 500 kWp array models at about 433,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Bedworth
96 m phase 1
Drawing Bedworth unit
Roof 96 x 62 m
Array 500 kWp
Yield 433,000 kWh/yr
Scale 1:500 / Rev A / CV12

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Bedworth / Warwickshire
Midlands logistics park beside a motorway junction, several roofs carrying arrays
Industrial stock of the kind we survey across West Midlands.

Distribution centre solar across Warwickshire

What a roof in Bedworth actually generates

Modelled irradiation at this latitude is 1106 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 866 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.

Distribution stock around Bedworth clusters on M6 J3, A444 and A4254, which is where the large single-let roofs are.

We survey across the CV postcode area, starting from CV12.

Nuneaton and Bedworth is the planning authority for most sites here, and the built-up area holds a population of about 31,090, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Bedworth roof makes, month by month

What a Bedworth roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 23 kWh per kWpJanFeb: 38 kWh per kWpFebMar: 71 kWh per kWpMarApr: 100 kWh per kWpAprMay: 116 kWh per kWpMayJun: 118 kWh per kWpJunJul: 121 kWh per kWpJul121 kWh Aug: 102 kWh per kWpAugSep: 79 kWh per kWpSepOct: 49 kWh per kWpOctNov: 28 kWh per kWpNovDec: 20 kWh per kWpDec

Jul produces 6.0 times what Dec does on the same roof. A 500 kWp array here models at about 433,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2311,500
Feb3819,000
Mar7135,500
Apr10050,000
May11658,000
Jun11859,000
Jul12160,500
Aug10251,000
Sep7939,500
Oct4924,500
Nov2814,000
Dec2010,000
Source: EU PVGIS v5.2
FIG. 2 Bedworth against the rest of Warwickshire
  • Stratford-upon-Avon893
  • Rugby882
  • Warwick880
  • Leamington Spa880
  • Kenilworth877
  • Nuneaton866
  • Bedworth866

Bedworth ranks 7 of 7 towns we cover in Warwickshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 866 to 893, a spread of 27 kWh per kWp. Within Warwickshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution operates the distribution network across Warwickshire, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Warwickshire the planning database records 94 solar schemes totalling 1201 MW, of which 18 are operational (REPD Q1 2026).

Solar already consented near CV12

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Vauls Farm, Astley Lane - Solar Farm Industria Solar Bedworth Limited 16 MW Ground Awaiting Construction
Bedworth Lane, Coolliery Wood - Solar Farm & Battery Storage Sirius Environmental Limited n/a Ground Revised
Newgate Coolliery - Solar Farm & Battery Storage Sirius Environmental Limited 6 MW Ground Application Submitted
Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Bedworth

How much does a warehouse roof in Bedworth generate?
The model gives 866 kWh for every kWp installed here, so 500 kWp comes out at about 433,000 kWh a year before any shading losses. You need roughly 1,485 sqm of clear roof to fit it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Does the grid around Bedworth have capacity?
National Grid Electricity Distribution is the distribution network operator for Warwickshire. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. We submit it as part of the design.
Is planning permission needed for panels on a Bedworth unit?
Usually permitted development covers it. We still put the question to Nuneaton and Bedworth before design sign-off, and we tell you early if a full application is needed rather than discovering it late.
Has anyone near CV12 already done this?
The planning database records 3 solar schemes in this postcode district. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.