Solar panels for warehouses in Redhill
What makes a Redhill scheme work is rarely the panels. It is the condition of the roof underneath them. The survey measures the roof, not the postcode: cladding profile, purlin centres, remaining sheet life and the load the frame can take.
916 kWh per kWp a year at this latitude, so a 500 kWp array models at about 458,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in RedhillIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Logistics solar PV across Surrey
What a roof in Redhill actually generates
Modelled irradiation at this latitude is 1175 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 916 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 3 percent above the mean across the towns we cover, which is as good as UK rooftop gets outside the south coast.
Distribution stock around Redhill clusters on M25 J8, M23 J7 and A23, which is where the large single-let roofs are.
Surveys run across RH postcodes, RH1 outward.
Reigate and Banstead is the planning authority for most sites here, and the built-up area holds a population of about 32,525, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).
Redhill ranks 1 of 10 towns we cover in Surrey on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 900 to 916, a spread of 16 kWh per kWp. Within Surrey that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.
Solar already consented near RH1
From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.
| Scheme | Operator | Capacity | Mounting | Status |
|---|---|---|---|---|
| East Surrey Hospital, Canada Avenue -Solar Panels | Carbon3 | 2.1 MW | Roof | Awaiting Construction |
Grid connection through UK Power Networks
UK Power Networks operates the distribution network across Surrey, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.
Across Surrey the planning database records 74 solar schemes totalling 182 MW, of which 6 are operational (REPD Q1 2026).
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Redhill
- Is there enough sun in Redhill to make this work?
- Modelled at 916 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 458,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once walkways and setbacks are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Who do we apply to for export in Redhill?
- Capacity varies street by street, and only UK Power Networks can answer it for your connection. We ask the question early, because an export-limited offer changes the design rather than killing the scheme.
- Do we need planning permission in Reigate and Banstead?
- In most cases no, because roof-mounted panels on commercial buildings sit within permitted development. The exceptions are listed buildings, conservation areas and arrays that stand proud of the roof plane. We check with Reigate and Banstead first either way.