warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Solar panels for warehouses in Market Drayton

Most of the industrial stock around Market Drayton carries a large, shallow-pitched roof that was never asked to do anything. Each survey records the cladding profile, the usable area once rooflights and plant are removed, and the export limit worth applying for.

842 kWh per kWp a year at this latitude, so a 500 kWp array models at about 421,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Market Drayton
96 m phase 1
Drawing Market Drayton unit
Roof 96 x 62 m
Array 500 kWp
Yield 421,000 kWh/yr
Scale 1:500 / Rev A / TF9

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Market Drayton / Shropshire
Midlands logistics park beside a motorway junction, several roofs carrying arrays
Industrial stock of the kind we survey across West Midlands.

Distribution centre solar across Shropshire

What a roof in Market Drayton actually generates

Modelled irradiation at this latitude is 1078 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 842 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 5 percent below the mean across the towns we cover, so the case here leans harder on how much you use on site rather than on raw generation.

We survey across the TF postcode area, starting from TF9.

Shropshire is the planning authority for most sites here, and the built-up area holds a population of about 12,060, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Market Drayton roof makes, month by month

What a Market Drayton roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

0255075100Jan: 20 kWh per kWpJanFeb: 36 kWh per kWpFebMar: 68 kWh per kWpMarApr: 100 kWh per kWpAprMay: 117 kWh per kWpMayJun: 117 kWh per kWpJunJul: 118 kWh per kWpJul118 kWh Aug: 99 kWh per kWpAugSep: 77 kWh per kWpSepOct: 46 kWh per kWpOctNov: 26 kWh per kWpNovDec: 18 kWh per kWpDec

Jul produces 6.6 times what Dec does on the same roof. A 500 kWp array here models at about 421,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2010,000
Feb3618,000
Mar6834,000
Apr10050,000
May11758,500
Jun11758,500
Jul11859,000
Aug9949,500
Sep7738,500
Oct4623,000
Nov2613,000
Dec189,000
Source: EU PVGIS v5.2
FIG. 2 Market Drayton against the rest of Shropshire
  • Ludlow860
  • Bridgnorth856
  • Oswestry855
  • Shrewsbury852
  • Market Drayton842

Market Drayton ranks 5 of 5 towns we cover in Shropshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 842 to 860, a spread of 18 kWh per kWp. Within Shropshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near TF9

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
The Old Airfield - Solar Farm Eaton-Upon-Tern Solar Limited 49 MW Ground Awaiting Construction
Cheswardine Hall Residential Home - Solar Panels Cheswardine Hall Residential Home n/a Ground Revised
Cheswardine Hall Residential Home - Solar Panels Cheswardine Hall Residential Home 0.24 MW Ground Awaiting Construction
TB Electrics, Sandford - Solar Panels T B Electrics 0.17 MW Roof Awaiting Construction
Merlot Chitty Farms, Betton - Solar Panels Merlott Chitty Farms 0.3 MW Roof Awaiting Construction

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Shropshire the planning database records 110 solar schemes totalling 813 MW, of which 27 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Market Drayton

What would a 500 kWp array produce in Market Drayton?
Yes, and the number matters more than the sunshine. At 842 kWh per kWp a year, a 500 kWp array on a Market Drayton roof models at around 421,000 kWh. What changes the answer is how much of that you use on site rather than export. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection in Market Drayton?
Applications go to National Grid Electricity Distribution, who run the network across Shropshire. They decide the export limit, and we handle the G99 paperwork alongside the array design.
What does Shropshire require for rooftop solar?
Roof-mounted panels on a commercial building usually fall under permitted development, subject to the limits on projection above the roof plane and to the building not being listed or in a conservation area. We confirm the position with Shropshire before the design is finalised.
Has anyone near TF9 already done this?
The planning database records 5 solar schemes in this postcode district, 2 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Shropshire locations