warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Solar panels for warehouses in Berwick-upon-Tweed

Most of the industrial stock around Berwick-upon-Tweed carries a large, shallow-pitched roof that was never asked to do anything. Each survey records the cladding profile, the usable area once rooflights and plant are removed, and the export limit worth applying for.

827 kWh per kWp a year at this latitude, so a 500 kWp array models at about 414,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Berwick-upon-Tweed
96 m phase 1
Drawing Berwick-upon-Tweed unit
Roof 96 x 62 m
Array 500 kWp
Yield 414,000 kWh/yr
Scale 1:500 / Rev A / TD15

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Berwick-upon-Tweed / Northumberland
North East industrial estate with solar arrays on several unit roofs
Industrial stock of the kind we survey across North East.

Distribution centre solar across Northumberland

What a roof in Berwick-upon-Tweed actually generates

Modelled irradiation at this latitude is 1049 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 827 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 7 percent below the mean across the towns we cover, so the case here leans harder on how much you use on site rather than on raw generation.

We survey across the TD postcode area, starting from TD15.

Northumberland is the planning authority for most sites here, and the built-up area holds a population of about 13,175, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Berwick-upon-Tweed roof makes, month by month

What a Berwick-upon-Tweed roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 18 kWh per kWpJanFeb: 33 kWh per kWpFebMar: 66 kWh per kWpMarApr: 101 kWh per kWpAprMay: 124 kWh per kWpMay124 kWh Jun: 115 kWh per kWpJunJul: 117 kWh per kWpJulAug: 98 kWh per kWpAugSep: 74 kWh per kWpSepOct: 43 kWh per kWpOctNov: 23 kWh per kWpNovDec: 13 kWh per kWpDec

May produces 9.5 times what Dec does on the same roof. A 500 kWp array here models at about 414,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan189,000
Feb3316,500
Mar6633,000
Apr10150,500
May12462,000
Jun11557,500
Jul11758,500
Aug9849,000
Sep7437,000
Oct4321,500
Nov2311,500
Dec136,500
Source: EU PVGIS v5.2
FIG. 2 Berwick-upon-Tweed against the rest of Northumberland
  • Blyth848
  • Alnwick840
  • Berwick-upon-Tweed827
  • Cramlington825
  • Morpeth824
  • Hexham803

Berwick-upon-Tweed ranks 3 of 6 towns we cover in Northumberland on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 803 to 848, a spread of 45 kWh per kWp. On a 500 kWp array that is about 22,500 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near TD15

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Berwick Holiday Centre, Magdalen Fields - Solar Panels Bourne Leisure Limited 0.36 MW Roof Awaiting Construction
Castle Hills Farm, Castle Hills - Solar Panels D And S Macpherson n/a Roof Awaiting Construction

Grid connection through Northern Powergrid

Northern Powergrid operates the distribution network across Northumberland, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Northumberland the planning database records 38 solar schemes totalling 276 MW, of which 2 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Berwick-upon-Tweed

What would a 500 kWp array produce in Berwick-upon-Tweed?
Yes, and the number matters more than the sunshine. At 827 kWh per kWp a year, a 500 kWp array on a Berwick-upon-Tweed roof models at around 414,000 kWh. What changes the answer is how much of that you use on site rather than export. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection in Berwick-upon-Tweed?
Applications go to Northern Powergrid, who run the network across Northumberland. They decide the export limit, and we handle the G99 paperwork alongside the array design.
What does Northumberland require for rooftop solar?
Roof-mounted panels on a commercial building usually fall under permitted development, subject to the limits on projection above the roof plane and to the building not being listed or in a conservation area. We confirm the position with Northumberland before the design is finalised.
Has anyone near TD15 already done this?
The planning database records 2 solar schemes in this postcode district, 2 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Northumberland locations