Solar panels for warehouses in Northallerton

Most of the industrial stock around Northallerton carries a large, shallow-pitched roof that was never asked to do anything. Each survey records the cladding profile, the usable area once rooflights and plant are removed, and the export limit worth applying for.

817 kWh per kWp a year at this latitude, so a 500 kWp array models at about 409,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Northallerton
96 m phase 1
Drawing Northallerton unit
Roof 96 x 62 m
Array 500 kWp
Yield 409,000 kWh/yr
Scale 1:500 / Rev A / DL6

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Northallerton / North Yorkshire
West Yorkshire industrial park below moorland, with solar on several roofs
Industrial stock of the kind we survey across Yorkshire and The Humber.

Distribution centre solar across North Yorkshire

What a roof in Northallerton actually generates

Modelled irradiation at this latitude is 1045 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 817 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 8 percent below the mean across the towns we cover, so the case here leans harder on how much you use on site rather than on raw generation.

Distribution stock around Northallerton clusters on A1(M), A19 and A684, which is where the large single-let roofs are.

We survey across the DL postcode area, starting from DL6.

Hambleton is the planning authority for most sites here, and the built-up area holds a population of about 13,310, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Northallerton roof makes, month by month

What a Northallerton roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

0255075100Jan: 19 kWh per kWpJanFeb: 33 kWh per kWpFebMar: 66 kWh per kWpMarApr: 99 kWh per kWpAprMay: 118 kWh per kWpMay118 kWh Jun: 112 kWh per kWpJunJul: 117 kWh per kWpJulAug: 99 kWh per kWpAugSep: 73 kWh per kWpSepOct: 43 kWh per kWpOctNov: 24 kWh per kWpNovDec: 15 kWh per kWpDec

May produces 7.9 times what Dec does on the same roof. A 500 kWp array here models at about 409,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan199,500
Feb3316,500
Mar6633,000
Apr9949,500
May11859,000
Jun11256,000
Jul11758,500
Aug9949,500
Sep7336,500
Oct4321,500
Nov2412,000
Dec157,500
Source: EU PVGIS v5.2
FIG. 2 Northallerton against the rest of North Yorkshire
  • Scarborough859
  • Whitby849
  • York840
  • Ripon834
  • Knaresborough833
  • Harrogate831
  • Northallerton817
  • Skipton799

Northallerton ranks 7 of 8 towns we cover in North Yorkshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 799 to 859, a spread of 60 kWh per kWp. On a 500 kWp array that is about 30,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near DL6

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Northallerton Big 60 Million 28 MW Ground Abandoned
Darlington Road - Solar Array North Yorkshire County Council 0.4 MW Roof Application Withdrawn
East Cowton Solar Farm Green Nation Solar Energy 30.81 MW Ground Application Submitted
Friarage Hospital - Solar Panels South Tees Hospitals NHS Trust 0.42 MW Roof Awaiting Construction

Grid connection through Northern Powergrid

Northern Powergrid operates the distribution network across North Yorkshire, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across North Yorkshire the planning database records 151 solar schemes totalling 1723 MW, of which 18 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Northallerton

Is there enough sun in Northallerton to make this work?
Modelled at 817 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 409,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once walkways and setbacks are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Who do we apply to for export in Northallerton?
Capacity varies street by street, and only Northern Powergrid can answer it for your connection. We ask the question early, because an export-limited offer changes the design rather than killing the scheme.
Do we need planning permission in Hambleton?
In most cases no, because roof-mounted panels on commercial buildings sit within permitted development. The exceptions are listed buildings, conservation areas and arrays that stand proud of the roof plane. We check with Hambleton first either way.
Has anyone near DL6 already done this?
The planning database records 4 solar schemes in this postcode district, 2 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All North Yorkshire locations